Transport above the road, with the public benefit worked out first

For ministers, ministries and regional governments. Celestavia is elevated electric transport: carriages with their own motors drive along large fixed steel ropes held by slim towers above roads and rivers. The carriage moves, not the rope; it is not a cable car and not a power line. Before anything is built, each country gets its own simulation of traffic, stations, power, cost, schedule and public benefit. Here are the results, the financing options and the steps.

11national networks with their own simulation, plus regional and city first phases
1.04–4.13benefit-cost ratio of the proposed first phases in eight countries, at the proposed fares
~20 %of a project contributed by the State in kind: the concession and the land
1.5 kV DCelectric traction, regenerative braking, up to 90 km/h; zero accidents is the design goal
What it solves

The problems a minister is asked to fix

Congestion

Adds capacity above the street without widening a road or closing lanes for years.

Road deaths and injuries

Every trip that leaves the road lowers the risk; the line is elevated and has no level crossings.

Floods and landslides

Lines run above flooded roads and the slides that cut towns off.

Rural access

Stations where they are needed: villages, schools, clinics and junctions along the line.

Freight and parcels

Parcels and 10-ft cargo boxes ride the same network, day and night.

Public land

Towers instead of a roadway: little land to buy, and the street below stays public.

Public benefit

Benefit-cost, country by country

Each national proposal counts travel time saved, vehicle costs, road deaths and injuries avoided and CO2 against the investment and 30 years of operation, at each country’s official social discount rate and at the fares we propose: a little above today’s bus, with the reduced fare the law requires for children, students, older people and people with disabilities.

National proposalNetworkInvestment (P10–P50–P90)Proposed Phase IWhole networkSocial discount rate
Colombia6,811 km, 16 light routesUS$ 19.8–21.9–24.1 bn1.571.03 (0.45–2.14)9 %
Ecuador3,704 kmUS$ 9.9–11.0–12.1 bn1.13 (Quito)0.3712 %
Peru10,512 kmUS$ 30.9–33.8–36.9 bn1.04 (Lima)0.68 intercity (0.27–1.32)8 %
Peru: Piura River and Poechos (regional)132 km, first stageUS$ 466–511–562 M0.93 (first stage)—8 %
Panama1,653 kmUS$ 4.4–4.9–5.4 bn1.380.8010 %
Mexico14,920 kmUS$ 37.1–40.8–45.0 bn2.17 (Cancún)0.4310 %
Argentina16,743 kmUS$ 38.2–42.2–46.8 bn1.98 (AMBA)0.7412 %
Brazil26,257 kmUS$ 63.2–69.9–77.3 bn1.60 (São Paulo, Rio)0.758.5 %
Spain7,916 km€ 28.1–31.8–36.1 bn4.13 (Mallorca)0.743 % (EU)
Sierra Leone1,468 kmUS$ 3.95–4.38–4.86 bn0.73 (Freetown)0.3110 %
Jamaica857 kmUS$ 3.9–4.4–5.0 bn—0.348 %
Suriname541 kmUS$ 2.10–2.33–2.61 bn—0.198 %

Benefit-cost ratio: the value of the benefits divided by the cost, both over 30 years (above 1, the benefits exceed the cost). Counted on transport benefits alone, whole national networks reach 0.19–1.03 at the proposed fares, while the proposed first phases reach 1.04–4.13 in eight countries. That is why every programme starts with the Phase I that gives the most benefit per dollar and grows as demand grows. Tourism, resilience, freight and land value are shown on each country page. The Colombia Pacific–Atlantic container corridor is presented separately on the Colombia page.

Lives, time, climate, jobs

What each national network gives back

Whole network at full operation, at the proposed fares. Road injuries are estimated from each country’s official ratio of injuries to deaths, or the regional median where no national count is published; they are undercounted.

CountryRoad deaths avoided a yearRoad injuries avoided a yearTravel hours saved a yearCO2 avoided a yearPeople at work (construction peak · operation)Economy (GDP)
Colombia690~16,500201 M752 kt (net)15,000 · 16,500+0.3 % after 10 years of operation
Ecuador52~400208 M355 kt10,000–12,400 each build year (direct and indirect)0.5 % of GDP in activity each build year
Peru (intercity network)283~4,6000.63 M a day1.4 Mt (road)16,300 · 19,5000.89 % a year while building; 0.29 % at year 10
Panama19~91039.5 M101 kt (net)5,500 · 3,2000.24 % at year 10
Mexico424~2,450316 M1,566 kt (net)28,000 · —0.11 % at year 10
Argentina239~5,710407 M1,078 kt (net)14,400 · 21,9000.56 % a year while building; 0.34 % at year 10
Brazil585~14,000533 M2,990 kt (net)26,300 · 40,1000.13 % at year 10
Spain13~1,01076.4 M386 kt (road)15,500 · 16,3000.17 % a year while building; 0.04 % at year 10
Sierra Leone105~2,50081.0 M115 kt (road)4,700 · 3,100+1.1 % a year by year 10
Jamaica24~560—220 kt (road)— · 3,4001.4 % at year 10
Suriname6~280——4,900 · 1,6001.0 % at year 10

People employed, not job-years. “(road)”: the emissions of the road trips removed; the net figure depends on the power source chosen in each country’s power study. Method, sources and the levers that raise each figure are on each country page.

Financing

Financing options for the State

The structure is chosen with the government in Phase 0. These are options, not offers; each country page shows them with its own figures.

Concession, with the State as partner

The State contributes the concession, the air easement and the land in kind (around 20 % of the project; more where road medians and station sites are available) and shares in the results in that proportion.

Development banks and multilateral lenders

Long-term sovereign or sovereign-backed loans for the works, at the rates these lenders offer for public transport.

Availability payment

The State pays a yearly amount for a line kept available and on time, after the fare surplus and the other income. Example: Panama Phase I, about US$ 37.2 M a year for 25 years.

Co-financed works

The State pays part of the line works; the concessionaire finances the rest, operates the line and collects all its income.

Public-private partnership

Under each country’s PPP law, with the risks shared and the operator in charge of fares and the other income: parcels, advertising, fibre and 5G, megastation floors.

No public payment

Where fares and other income cover operation and capital, no yearly public payment is needed: for example the proposed first phases in Cancún (Mexico) and Lima (Peru).

Your part

What the government provides

Right of way

Road medians and road edges for the towers, and a legal framework for the line’s air easement.

Concession and land

The concession, and land for stations, depots and megastations.

Permits

Environmental licence, construction permits and prior consultation where the law requires it.

Power

Contact with the electric utility. Where the grid falls short, Celestavia carries its own high-voltage feeder along the line and adds its own generation; the questions we ask the utility are listed on the home page.

Data, later

Our studies start from public sources. During Phase 0 we ask for the official data the study needs: traffic counts, origin-destination surveys, bus and taxi registers.

A counterpart team

A small team that works with ours during Phase 0 and takes the route, fare and financing decisions.

How to start

Five steps, and money committed only when it is needed

  1. Letter of interest

    A letter from the government to Celestavia Co. (template below). It creates no financial obligation.

  2. Phase 0: studies and simulation

    Traffic simulation of your city or corridor, field surveys, route and station options, power study, environmental baseline and the concession structure. Certification of the system is completed in Phase 0, before the notice to proceed.

  3. Willingness-to-pay and demand surveys

    Passengers, businesses and visitors are asked what they would pay; the fares and the demand forecast are set from the answers.

  4. Funding decision

    The government chooses its financing option; lenders and investors commit after the studies and the surveys, not before.

  5. Notice to proceed and construction

    Towers, carriages, cabins and buildings are built under contract, with preference for local companies. In our schedule simulations a first section opens about two to three years after the notice to proceed.

Our commitment to today’s transport workers: compensation for the vehicles the traffic simulation shows are taken off the road, buses converted to new uses rather than scrapped, and priority for drivers and helpers in the new jobs.

Step 1

Letter of interest: template

Copy or download the text, put it on your letterhead and adapt it. Then send it to us through the contact form (choose “Government Inquiry”).

[Letterhead of the ministry, government or authority]

[Place], [date]

To: Celestavia Co. (Global Genius Trust)
Subject: Letter of interest - Celestavia elevated electric transport for [city, corridor or country]

The [name of the ministry, government or authority] expresses its interest in evaluating the Celestavia elevated electric transport system for [city, corridor, region or national network].

To that end, we are willing to:

1. Take part, together with Celestavia Co., in a Phase 0 study and traffic simulation of [area or corridor].
2. Name a counterpart team: [name, position, telephone].
3. Share the public information we hold on traffic, roads, power supply and land and, during Phase 0, the official data the study needs.
4. Review the route and station options, the results of the willingness-to-pay and demand surveys, and the financing options that come out of the study.

Our priorities for this project are: [for example: congestion, road safety, access for rural communities, resilience to floods, links to the airport or the port].

This letter does not create any financial obligation or exclusivity for either party. Any agreement will be set out in separate documents.

[Signature]
[Name]
[Position]
[Institution]
Send it through the contact form

Bring Celestavia to your country

Send your letter of interest, or ask for a briefing for your ministry. Choose “Government Inquiry” in the contact form and tell us which city, corridor or region you have in mind.

Projections, not guarantees. Costs are ranges until suppliers quote.