A second transport system for Salone, above the road
Celestavia is an elevated electric transport system: carriages with their own wheel motors drive along two large fixed steel ropes per track, held up by slim towers above the street. The carriage moves, not the rope (it is not a cable car and not a power line). The chassis with the motors runs on top; the 9-seat cabin hangs below and is lowered at the stations. Proposed here: Freetown's East–Central spine first, then a 1,468 km national network to every district capital and both land borders.
Projections, not guarantees. Costs are ranges until suppliers quote. Real-world statistics carry their source and year.
Summary for the Government
The problem
Freetown sits on a narrow strip between the Atlantic, the estuary and the mountains, and almost every trip from the east, from Waterloo and from the provinces uses one coastal corridor through Wellington and Kissy. At the morning peak the centre moves at about 3 km/h (World Bank, Sierra Leone Economic Update 2018). Walking is the main way to travel: 31 to 54 % of the people counted at the city's main junctions were on foot (UCL T-SUM City Profile Freetown, 2021), and a quarter of Western Area Urban, about 350,000 people, lives more than 500 m from a bus stop (World Bank IRUMP appraisal, 2019). The WHO estimates 1,165 road deaths in Sierra Leone in 2021, of which only 336 were reported (Global Status Report on Road Safety 2023); no national count of road injuries is published. The airport is across the estuary, reached by water taxi (about 30–40 minutes on the water, US$ 40–60 one way; Visit Sierra Leone, 2025) or the Kissy–Tagrin ferry.
The national solution
An elevated electric network on point foundations, built above the existing road reserves: a 1,468 km national network with city lines in Freetown, Bo, Kenema and Makeni, trunk lines from Waterloo to Port Loko and Lungi, Makeni, Bo and Kenema, district lines to Koidu, Kabala, Kailahun, Kambia and Gbalamuya, Pujehun and Jendema, Mattru Jong and Moyamba, the peninsula coast, and a link across the estuary to Freetown International Airport once a marine study confirms it. Traction is 1.5 kV DC, 100 % electric with regenerative braking. The goal is zero accidents: the line has no level crossings and no mixed traffic.
What it delivers
- Time: Calaba Town to Central Freetown at 06:15 takes 28 minutes by Celestavia for a walk-in passenger and 27 minutes with the booking app (no wait at the station), against about 1.6 to 2.9 hours by poda-poda today (estimated from the corridor speeds of the traffic model).
- Access: 905,100 people live within an 800 m walk of a city station; populated areas get a station every 300–400 m.
- Safety and resilience: a second system that does not depend on the one road, runs above floods and gives the hill settlements a way down that is not the road.
- Phase I (proposed): the East–Central spine Waterloo – Jui – Calaba Town – Wellington – Kissy – Central, 32 km, US$ 353 M (P50), first service September 2031 (P50; P90 April 2032).
Self-initiated proposal. Celestavia prepared this proposal on its own initiative from public data and its own models. It has not been discussed with the Ministry of Transport and Aviation, Freetown City Council or any other Sierra Leonean authority, and no section is approved. Amounts are not an offer.
Videos
How Celestavia works, in short videos. Some shots show our design study for Loja, Ecuador; figures are from that study.
Public benefits and the economy
| Benefit (at the proposed fares) | Whole network | Proposed Phase I |
|---|---|---|
| Trips a day (opening year) | 271,204 | 108,341 |
| Hours of travel saved a year | 81.0 M | 36.3 M |
| Road deaths avoided a year | about 105 | about 8 |
| Road injuries avoided a year (estimate: with no national injury count, the median ratio of injuries to deaths in the region's official statistics is used) | about 2,500 | about 180 |
| CO2 avoided on the road a year | 114,712 t | 8,827 t |
| People at work | 4,700 in construction at the peak, 1,700 making parts, 3,100 in operation, plus 3,100–6,100 indirect | 3,600 in construction at the peak, 900 in operation |
| GDP effect | +5.3 % of one year's GDP over the build years; +1.1 % a year by year 10 | +0.9 %; +0.21 % a year |
| Benefit-cost ratio (10 % social discount rate) | 0.31 (0.27 with lighter traffic) | 0.73 (0.37 with lighter traffic; 1.17 at higher values of time and of life) |
| Benefit-cost ratio at the study's poda-poda fares (for reference) | 0.36 (0.31 with lighter traffic); 311,171 trips a day | 0.83; 123,290 trips a day |
Reading the benefit-cost ratio. Time is valued at US$ 0.6 an hour (Sierra Leone's GDP per person is about US$ 850; World Bank, 2025), people who walk today are counted at a quarter of their number with at most 10 minutes saved each, and the lighter-traffic case assumes today's roads 30 % faster than the traffic model found. Access for people who cannot afford a motorised trip today, resilience in the rains and the land the line does not take are not counted in money. With higher values of time and of life, as incomes grow, Phase I passes 1.0.
Inclusion: step-free cabins with room for a wheelchair or a pram; fares at poda-poda level; stations every 300–400 m in the built-up city. Safety: the goal is zero accidents; pedestrians, okadas and kekes never share space with the line. Rail: there is no official worldwide total of rail casualties; in the European Union 13,836 people were killed and 10,475 seriously injured in significant rail accidents in 2010–2024 (Eurostat), and in the United States 963 died and 6,535 were injured in 2024 (FRA), mostly people on the tracks and at level crossings. Climate: 100 % electric with regenerative braking; the CO2 balance depends on the power source chosen. The programme supports the Sustainable Development Goals on cities (SDG 11), infrastructure (SDG 9), road safety (target 3.6) and climate action (SDG 13).
Cost and phasing
National cost (P10–P50–P90): US$ 3.95–4.38–4.86 billion for 1,468 km: US$ 2.69–2.98–3.31 M per km with stations and US$ 2.18–2.41–2.68 M per km without (stations = small and medium stations, their access to the line and the megastations; computed draw by draw). It includes towers, ropes, power, systems, stations and the opening fleet; land is not included. Carriages and cabins are priced as series automotive parts.
The cost includes the design's engineering upgrades (disc brakes with regeneration and a graded rope brake, 21-day batteries in every tower with its 5G, anchor hardware, protection of towers against vehicle impact, ropes with a safety factor of 3.15, evacuation, accessibility and cabins to the EN 45545 fire standard): US$ 435 M (+10.0 % of the project grand total); and active cabin suspension (a mechanism between the carriage and the cabin that evens out the gentle rise and fall along the rope) on the trunk and district lines and on the city lines with trips over 30 minutes: US$ 89 M (+2.0 % of the project grand total). In Phase I: US$ 19.8 M of upgrades (+5.6 % of the Phase I grand total) and US$ 15.4 M of active suspension (+4.4 % of the Phase I grand total).
| Part of the network | km | P50, US$ M |
|---|---|---|
| Trunk and district lines (14 routes) | 1,357 | 3,310 |
| City lines: Freetown (4), Bo (2), Kenema, Makeni | 93 | 850 |
| Lungi airport link across the estuary (subject to a marine study) | 18.5 | 211 |
Phase I: four candidate packages compared
Phase I is the package with the greatest public benefit per dollar and the clearest need, ranked on the lower of the two benefit-cost ratios (calibrated traffic and lighter traffic), then on hours saved per dollar.
| Package | km | Cost P10–P50–P90, US$ M | US$ M/km with / without stations (P50) | Trips a day | Hours saved a year | Benefit-cost (base / lighter traffic) |
|---|---|---|---|---|---|---|
| Freetown East–Central spine F1: Waterloo – Hastings – Jui – Calaba Town – Wellington – Kissy – Central (PZ) (proposed Phase I) | 32 | 312–353–403 | 11.01 / 6.00 | 123,290 | 41.3 M | 0.83 / 0.42 |
| Freetown spine F1 + west line F2 (Central – Kingtom – Congo Cross – Wilkinson Road – Lumley) | 41 | 393–445–509 | 10.82 / 5.77 | 115,447 | 38.7 M | 0.63 / 0.32 |
| Bo – Kenema corridor (R05) with the Bo and Kenema city lines (B1, B2, K1) | 85 | 322–356–393 | 4.20 / 3.03 | 92,861 | 15.1 M | 0.57 / 0.42 |
| Freetown full (F1 + F2 + F3 coast road + F4 hill line Regent – Grafton) and the Lungi airport link L1 across the estuary | 92 | 797–907–1,040 | 9.84 / 6.19 | 133,732 | 43.1 M | 0.42 / 0.25 |
The spine and the Bo – Kenema package are level on the cautious ratio (within 0.01); the spine serves the capital's single corridor and saves almost three times more hours per dollar, so it is the proposed Phase I. Bo – Kenema is the natural first provincial stage.
Schedule
| Stage | What happens | When (P50 / P90) |
|---|---|---|
| Phase 0 | Agreement with the Government, traffic counts and household survey, geotechnics, environmental and social assessment with the Environment Protection Agency, financing, and system certification completed in Phase 0, before the notice to proceed | from 2027 |
| Phase I | Freetown East–Central spine, 32 km; first section in service September 2031 | September 2031 / April 2032 |
| Phase II | Rest of Freetown, the trunk to Port Loko, Lungi, Bo and Kenema, the district lines with the highest benefit, 1,161 km | April 2032 / December 2032 |
| Phase III | Remaining district lines and Makeni, 275 km | May 2033 / March 2034 |
Schedule modelled with car and truck makers building carriages and cabins in parallel; no phase commits the country to the next.
Financing options for the Government
These are options to discuss, not offers, and no funding is in place. Phase I at US$ 353 M (P50) could combine:
| Option | How it works | Order of magnitude, Phase I |
|---|---|---|
| Concession and land | The State, as partner, grants the concession and the aerial right of way along the public road reserves (about 20 % of the value, in kind) and owns the concession | US$ 71 M in kind |
| Development partners | Concessional or development-bank finance, for example from the World Bank, the African Development Bank or other partners already active in Freetown's mobility (IRUMP, CAMIP); the Millennium Challenge Corporation's compact (US$ 480.7 M, signed 27 September 2024) is for energy, which a power solution for the line could complement | loan service about US$ 11 M a year on concessional terms, US$ 20 M at 5 % over 25 years (80 % of the cost) |
| Availability payment | A private concessionaire builds, finances and operates; the State pays a yearly amount for a line kept available and on time | about US$ 34 M a year for 25 years at 7 % (0.5 % of GDP) |
| Public-private partnership | A PPP under the Public Private Partnership Act 2010, with fares, parcels, advertising and fibre leasing as revenue | structured in Phase 0 |
These figures use the fares and other income in the next section.
Phase I fares and income
Celestavia is offered as a quality service: the standard fare sits a little above the poda-poda on short trips and between it and a keke or taxi on longer ones. Fares are indexed to inflation every year (a concession clause). Anyone who does not want to share can book the whole cabin.
Social fare: pupils in school uniform, older people and persons with disability pay a social fare equal to today's bus fare. Source: no statutory fare concession was found: the Persons with Disability Act 2011 (s. 25) requires access to public transport but sets no fare; the social fare is proposed for these groups at today's poda-poda fare. In this calculation they make 25 % of residents' trips (an estimate: no published share of these groups' trips was found). Visitors never pay the social fare.
| Trip | Social fare (residents) | Standard fare | Local reference |
|---|---|---|---|
| Short trip (up to 13 km) | Le 5.0 (US$ 0.22) | Le 6.3 (US$ 0.28) | poda-poda and shared taxi, Le 3–5 |
| Medium trip (over 13 km) | Le 7.0 (US$ 0.31) | Le 10.5 (US$ 0.46) | longer poda-poda rides, Le 6–8 |
| In a mature year | At poda-poda fares | With these fares and income |
|---|---|---|
| Passengers a day | 123,290 | 108,341 |
| Fares a year (with these fares, private cabins included) | US$ 9.0 M | US$ 11.0 M |
| Other net income a year | not counted | US$ 2.1 M (US$ 0.6 M – US$ 6.6 M) |
| Operating cost a year | US$ 16.6 M | US$ 16.6 M |
| Do they cover operation? (times the cost) | 0.54 | 0.79 (fares alone: 0.66) |
| Public payment still needed a year | US$ 37.9 M | US$ 33.7 M |
| Benefit-cost ratio | 0.83 | 0.73 |
Public payment still needed: About US$ 33.7 M a year, by the same method as the financing section. With half the passengers it would be about US$ 39.2 M a year.
Benefit-cost ratio at these fares: 0.73 (at poda-poda fares, 0.83). With higher fares some passengers stay on the road: the line keeps 88 % of the car and minibus trips it takes off, above the 75 % minimum we set. The State can choose lower fares: more public benefit, more public payment.
Other income (net of its cost)
| Source | Net a year (base) | Range |
|---|---|---|
| Advertising (cabins, stations, app, sponsorship) | US$ 0.8 M | US$ 0.3 M – US$ 2.3 M |
| Towers for mobile operators and fibre backbone | US$ 0.4 M | US$ 0.1 M – US$ 0.8 M |
| Parcels and lockers | US$ 0.3 M | US$ 0.1 M – US$ 1.5 M |
| Anonymous data and app bookings | US$ 0.2 M | US$ 0.0 M – US$ 0.7 M |
| Shops and kiosks at stations | US$ 0.2 M | US$ 0.1 M – US$ 0.4 M |
| Station waste | US$ 0.2 M | US$ 0.0 M – US$ 0.6 M |
Each source is counted net of its cost and ramps up over its first years; the values are estimates with ranges, without partner quotes. Public-service contracts (emergency and fire support, weather, air and traffic monitoring) are paid services, not the State's share: the State contributes the concession and the land in kind (up to 20 %, never a controlling stake). Without the least certain sources (light cargo, municipal waste haul, emergency support) the cover would be 0.78 times. Land value capture: an option, not included.
Comparison with the alternatives
| Option | Cost per km (order of magnitude) | Public benefit and constraints |
|---|---|---|
| Celestavia (this study) | US$ 3.0 M national average with stations; Freetown spine US$ 11.0 M with dense stations and fleet | No land take beyond tower footprints and stations; above floods; no mixed traffic; built over the existing road while it stays open |
| Bus priority / BRT | about US$ 1–15 M (international range, ITDP BRT Planning Guide) | Needs road width Freetown does not have on its main corridor; shares the road with okadas and pedestrians; Waka Fine buses already carried about 22,000 passengers a day by late 2024 (World Bank IRUMP); Celestavia stops interchange with them |
| Light rail or metro | about US$ 30–100 M and more (international range) | Needs a continuous corridor of land or tunnels through the hills |
| New or wider roads | depends on resettlement; the proposed 7 km Lungi road bridge is estimated at US$ 1.2–2 billion (press, 2019–2025) | Induces settlement along the road, cuts drainage, mixed traffic |
| Freetown cable car (pilot) | 3.6 km, five stations, about US$ 92 M (C40 Cities Finance Facility feasibility study) | A complementary city project; the Celestavia spine would connect to it at Kissy and in the centre, not duplicate it |
Transition support for poda-poda, taxi, okada and keke workers
Support goes only to the vehicles the traffic model takes off the road (fleet × the fall in peak vehicle trips). Whole network: 166–1,079 poda-podas and buses, 414–2,599 shared taxis and 1,839–4,437 okadas and kekes; Phase I: 143–1,005, 276–2,133 and 269–674.
- Income support until each person is in work of equal or better income, paid from the operating company's profits first; an income top-up when the new job pays less; early retirement for those within about five years of retirement age.
- New work first for the people affected: station staff, feeder and cargo services, maintenance, and franchise or share options.
- Minibuses and buses are not scrapped: they are refurbished as feeders to the stations, mobile clinics or campers for tourism.
- Estimated cost US$ 2.4–72.1 M for the whole network (Phase I US$ 1.3–50.6 M), paid in the first years of operation.
How it works
Each track has two large steel ropes, fixed and tensioned between slim towers. An electric carriage (the chassis, with its wheel motors, on top) drives along the ropes; the 9-seat cabin hangs below it, separate, and is lowered to the platform at small stations or carried on through megastations. Cabins are called by app or at the station and go to the passenger's stop, pooling with others on the way. Light 2.5 t cargo boxes for parcels, fish, produce and medical supplies use the same line. Towers carry fibre, 5G and cameras; every tower has batteries for 21 days without power.
Traffic simulation
Our proprietary platform modelled the morning peak (05:30–08:00) in Freetown and the Western Area, Bo, Kenema and Makeni: every person's trip from the census residents (Statistics Sierra Leone, 2015 census wards), the mode split of the World Bank and UCL Freetown studies, and the main road network, today and with the city lines. Freetown's main roads in the model average 13 km/h at the peak, with the eastern corridor near standstill; a lighter-traffic case with the roads about 30 % faster (17 km/h) is used to test every result.
Because walking is the main mode, people who walk today and would switch are counted at a quarter of their number, with at most 10 minutes saved each: they gain the most in comfort and safety, but a trip they already make on foot is not counted as a large time saving.
| City | City lines, stations | Trips a day (corrected) | Walk-in wait, 95th percentile | Peak road speed today |
|---|---|---|---|---|
| Freetown and Western Area | 74 km, 165 | 129,894 | 2.7 min | 13 km/h |
| Bo | 9 km, 19 | 44,646 | 3.3 min | 24 km/h |
| Kenema | 4 km, 11 | 38,821 | 1.9 min | 21 km/h |
| Makeni | 5 km, 14 | 24,992 | 3.3 min | 25 km/h |
Walk-in passengers wait under 10 minutes at every station (typically 2–4 minutes); with the booking app passengers arrive just in time and board without waiting.
Network and stations
Lines follow the existing trunk roads between named towns (indicative: tower and station positions come from the feasibility study). Populated areas get at least one station per kilometre, usually two to three; rural stretches only where there are villages, junctions, schools or clinics. Small stations can be as small as two spaces (one cabin and one cargo box).
| Line | Route | km | Stations | Phase |
|---|---|---|---|---|
| R01 | Waterloo – Newton – Masiaka | 45 | 13 | II |
| R02 | Masiaka – Port Loko – Lungi airport (land route) | 90 | 20 | II |
| R03 | Masiaka – Lunsar – Makeni | 105 | 20 | III |
| R04 | Masiaka – Mile 91 – Taiama – Bo | 163 | 26 | II |
| R05 | Bo – Kenema | 71 | 19 | II |
| R06 | Makeni – Magburaka – Koidu | 149 | 27 | II |
| R07 | Kenema – Tongo – Koidu | 101 | 20 | II |
| R08 | Makeni – Kabala | 114 | 14 | III |
| R09 | Kenema – Segbwema – Daru – Pendembu – Kailahun | 99 | 26 | II |
| R10 | Port Loko – Kambia – Gbalamuya (Guinea border) | 56 | 15 | II |
| R11 | Bo – Pujehun – Potoru – Zimmi – Jendema (Liberia border) | 183 | 26 | II |
| R12 | Bo – Sumbuya – Mattru Jong | 77 | 11 | II |
| R13 | Taiama – Moyamba | 47 | 6 | III |
| R14 | Peninsula coast: Hamilton – Sussex – Tokeh – York – Kent – Tombo – Kerry Town – Waterloo | 56 | 35 | II |
| F1 | East-Central spine: Waterloo – Hastings – Jui – Allen Town – Calaba Town – Wellington – Kissy – Cline Town – Central (PZ) | 32 | 78 | I |
| F2 | West: Central (PZ) – Kingtom – Congo Cross – Wilkinson Road – Lumley | 9 | 24 | II |
| F3 | Western coast road: Aberdeen – Lumley – Goderich – Lakka – Hamilton | 11 | 23 | II |
| F4 | Hill line: Congo Cross – Hill Station – Regent – Grafton – Jui | 22 | 49 | II |
| B1 | Bo: Kandeh Town – Clock Tower – Njala University – Joe Town | 5 | 12 | II |
| B2 | Bo: Bo Airfield – centre – New Site – Gbondo Town | 5 | 13 | II |
| K1 | Kenema: Kpetema – centre – Blama Road | 4 | 11 | III |
| M1 | Makeni: Azzolini Highway south – centre – Teko Road north | 5 | 14 | III |
| L1 | Lungi airport link: Kissy – estuary – Tagrin – Lungi – Freetown International Airport | 18.5 | 4 | II |
The Lungi crossing
Freetown International Airport handled 268,929 passengers in 2025 (Sierra Leone Civil Aviation Authority, reported 2026). A Celestavia link from Kissy to Tagrin crosses about 7.5 km of open water: marine towers, a navigation span for ships to Pepel, and corrosion protection, all to be set by a marine study, which is why it carries its own allowance. About 3,838 crossings a day (airport travellers and Lungi residents), saving about an hour each against the water taxi or the ferry. If the Lungi road bridge is built, the line would ride alongside it instead. The land route Masiaka – Port Loko – Lungi (R02) reaches the airport either way.
Power
Traction is 1.5 kV DC on every line. The whole network needs about 91 MW at the peak and 465 GWh a year (with regenerative braking returning about 25 %). The power source is open and is set in a power study, with costs as ranges: grid connection at each substation (US$ 13–64 M), the line's own high-voltage feeder on its towers where the grid cannot supply (US$ 69–179 M), own generation of any kind beyond the grid (US$ 23–60 M), and batteries. Every battery sits in a fireproof container with its own fire suppression; carriage packs can be swapped at stations.
Weather, hazards and monitoring
Rain, flash floods and landslides are Sierra Leone's binding hazards: 3,000–5,000 mm a year on the coast and more than 800 mm a month in July and August (World Bank, 2019). Towers stand outside stream channels and span gullies instead of filling them; hill-line towers are sited on geotechnical survey. Tropical cyclones do not reach Sierra Leone; the governing wind is the squall line at the start and end of the rains. The earthquake hazard is low. Salt exposure is designed for along the coast and the estuary.
- 2015: Freetown floods (16 September): thousands displaced in the Western Area (ReliefWeb / Office of National Security, 2015)
- 2017: Regent mudslide and floods (14 August): 1,141 people dead or missing (World Bank / GFDRR, 2017)
- 2019: Western Area floods (August): thousands affected, hillside and riverside settlements (ReliefWeb, 2019)
- 2022: Freetown floods and landslides (August-September): deaths and displacement in the east and hill settlements (ReliefWeb, 2022)
| Hazard | L0 full service | L1 reduced | L2 secured | L3 recovery |
|---|---|---|---|---|
| Wind (squall lines at the start and end of the rains) | gust < 90 km/h | 90–136 km/h or a storm warning: no passengers (the last trips end first); empty cabins and light boxes at reduced speed | forecast > 136 km/h: cabins to stations and depots, line secured | tower cameras and drones, battery rescue carriages, reopening section by section |
| Rain, flash floods and flooding | < 30 mm/h | 30–60 mm/h or streams on alert: scour sensors at crossings, low platforms watched | red alert in the catchment: affected sections out of service, fleet to raised depots | foundation inspection by cameras and drones; the line serves as an emergency route when a road is cut |
| Landslides (Regent, Grafton and the hill settlements) | slopes monitored | inclinometers or accumulated rain on alert: reduced speed on the section | movement detected: section closed, cabins held at stations | geotechnical review, reopening by section |
| Earthquake (low hazard) | no event | seismic alert: gentle braking of all carriages | strong shaking: line stopped, inspection before restart | tower-by-tower inspection |
| Power cut | normal supply | loss of a feed: on-board batteries reach the next station; towers on their own batteries (21 days) | wide outage: service reduced to the battery and own-generation reserve | push recovery to the next stop where needed; monitoring keeps running on tower batteries |
Monitoring backbone: fibre and 5G along the towers, cameras, weather, rain and slope sensors, and 21-day tower batteries keep the line watched through any outage.
Method, data to request later
Traffic: morning-peak model of every person's trip on the main roads, calibrated to an assumed rush-hour speed (no official corridor speed or counts are public), with the census wards of 2015 (the 2021 mid-term count for Western Area Urban, 609,174, is lower and was contested by Freetown City Council). National demand: a gravity and mode-choice model between the district towns of the 2015 census, with intercity trip rates set low for Sierra Leone's incomes. Cost: probabilistic estimate of every quantity and unit price, per km with and without stations computed draw by draw. Economics: time, vehicle costs, safety and CO2 valued by benefit transfer at a 10 % social discount rate, with the walking correction and the lighter-traffic test.
Data to request later: a Freetown household travel survey and traffic counts; vehicle registrations by type; official fare tables (Sierra Leone Public Transport Authority); intercity bus and lorry-park counts; ferry, water-taxi and airport passengers by ground mode; estuary bathymetry and the navigation channel; geotechnical, landslide and flood maps of the Western Area; the Ministry of Finance's social discount rate; and the power utility's supply capacity and tariffs.
Contact
For the social aspect of the project
www.fundaaafi.orgGlobal Genius Trust USA · Celestavia USA
www.celestavia.com www.grupogenio.comDo you represent a government, a public body or an NGO?
Request detailed technical and financial information to assess Celestavia for your city or district.
Request informationSɛkɔn transpɔt sistɛm fɔ Salone, oba di rod
Celestavia na ilɛktrik transpɔt we de go oba di strit: di kariej, wit in yon mɔta pan di wil dɛn, de rɔn pan tu big stil rop fɔ ɛvri layn, we tawa dɛn de ol. Na di kariej de muv, nɔto di rop. Di chasis wit di mɔta dɛn de na tap; di kabin wit nayn sit de ang dɔŋ, ɛn dɛn kin put am dɔŋ na di steshɔn.
Ɔl di nɔmba dɛn na dis pej na simyulayshɔn frɔm di Celestavia platfɔm, nɔto disayn we dɛn dɔn kɔnfam. Dis na di Krio vɛshɔn; if di Krio ɛn di Inglish nɔ gri, na di Inglish go kɔnt.
Smɔl wɔd fɔ di Gɔvmɛnt
Fritɔŋ de pan smɔl lan bitwin di si, di riva ɛn di mawnten, ɛn bɔku bɔku trip de pas wan rod nɔmɔ, tru Wɛlintin ɛn Kisi. Na mɔnin, kar dɛn na di sɛntral de waka bɔt 3 km insay wan awa (World Bank, 2018). Bɔku pipul de waka na dɛn fut. Celestavia go gi Salone sɛkɔn transpɔt sistɛm we nɔ de pan di rod, we de rɔn oba wata we de flɔd, ɛn we nɔ de mix wit okada, keke ɔ pipul we de waka. Di gol na fɔ nɔ gɛt ɛni aksidɛnt.
Fɛs Stej (fɔ di Gɔvmɛnt fɔ disayd)
Di big layn na Fritɔŋ: Waterloo – Jui – Calaba Town – Wɛlintin – Kisi – Sɛntral, 32 km, US$ 312–353–403 milyɔn, bɔt 108,341 trip ɛvri de. Frɔm Calaba Town to Sɛntral na 06:15: bɔt 28 minit wit Celestavia. Di fɔs pat go bigin wok bɔt September 2031 (simyulayshɔn). Afta dat, Bo – Kɛnɛma ɛn di ɔda layn dɛn.
Aw fɔ pe fɔ am (na tin fɔ tɔk bɔt, nɔto ɔfa)
- Di Gɔvmɛnt, as patna, gi di kɔnsɛshɔn ɛn di rayt fɔ yuz di say oba di rod (bɔt 20 %, US$ 71 M).
- Lon frɔm divɛlɔpmɛnt patna dɛn, lɛk di World Bank ɔ di African Development Bank.
- Avelabiliti pemɛnt: wan kɔmpin bil ɛn rɔn am, ɛn di Gɔvmɛnt pe ɛvri ia fɔ layn we de wok fayn.
- PPP ɔnda di Public Private Partnership Act 2010.
Nɔbɔdi nɔ dɔn gri fɔ gi mɔni yet. Di fɛr go smɔl mɔ pas di poda-poda fɛr; studɛnt dɛn, ol pipul ɛn pipul we nɔ gɛt mɔni go pe di sem fɛr as poda-poda.
Kɔntakt
Global Genius Trust USA · Celestavia USA
www.celestavia.com www.grupogenio.comYu de wok fɔ gɔvmɛnt, pɔblik ɔfis ɔ NGO?
Aks fɔ di ful tɛknikal ɛn mɔni ditel dɛn fɔ si if Celestavia fit fɔ yu siti ɔ yu distrikt.
Aks fɔ infɔmeshɔnDi nɔmba dɛn na dis pej na fɔs-stɛp tɛknikal ɛn mɔni stɔdi fɔ Celestavia prɔgram na Salone, ɛn dɛn go chenj afta di fayn fizibiliti stɔdi. Nɔ Salone ɔtoriti nɔ apruv ɛni pat yet.
Join us
Join Celestavia
Public authorities, transport operators, business people and the general public are invited to learn about the proposal, share their ideas and join in. Sign up and we will keep you posted on the project.