Where Celestavia fits in the United States
Electric carriages run on large, fixed high-strength steel cables carried by towers above the streets, freeways, rivers and canyons; a nine-seat passenger cabin or a light 10-ft cargo box hangs below each carriage. 1.5 kV DC, with braking energy returned to the line.
Two proposals are already published: Orlando and Northern California. This page adds five more, chosen from 22 places screened across the country: a mountain pass inside Los Angeles, the gateway to the most visited national park, a Sun Belt city without rail, a ski canyon and an island tourist district.
| Proposal | Line | US$ M (P10–P50–P90) | US$ M a mile, with / without stations | Passengers a day (low–base–high) | Benefit / cost (low–base–high) |
|---|---|---|---|---|---|
| Orlando Phase I (published) | 37.8 mi | 871–978–1,107 | 25.9 / 14.4 | 17.8 % equity IRR (base case counts half of the estimated passengers) | |
| Northern California Phase I (published) | 78.3 mi | 1,310–1,430–1,560 | 18.2 / 13.8 | 4.9 % equity IRR on 70 % of the passengers (14.1 % on all); an availability payment of about US$36-45 M a year gives 12 % | |
| Los Angeles: Sepulveda Pass | 12.1 mi | 221–251–287 | 20.9 / 13.5 | 5,186–14,436–32,594 | 0.37–1.27–3.21 |
| Great Smoky Mountains gateway | 14.8 mi | 230–264–306 | 17.9 / 11.2 | 5,086–15,612–34,853 | 0.50–1.49–3.35 |
| Nashville: airport – downtown | 7.0 mi | 162–190–223 | 27.1 / 15.0 | 6,682–13,820–24,824 | 0.39–1.06–2.36 |
| Little Cottonwood Canyon (Utah) | 13.7 mi | 228–259–296 | 19.0 / 12.7 | 2,264–5,168–9,534 | 0.23–0.57–1.15 |
| Honolulu: Skyline – Waikiki – UH | 5.1 mi | 159–184–214 | 35.8 / 19.4 | 4,731–12,281–25,942 | 0.38–1.10–2.53 |
Benefit/cost at the 7 % real discount rate of the federal benefit-cost guidance (December 2025). A first-of-a-kind margin is shown beside each total, not inside it. Each new proposal also comes as a lowest-price version and a full version, and every extra is priced on its own.
A film for this page will be made after the proposals are reviewed.
What each proposal costs, and how it can be financed
| Proposal (base version) | US$ M, P10–P50–P90 | First-of-a-kind margin beside (P50) | Project return, base case | Equity return, base case | Availability payment for a 10 % project return, US$ M a year | State’s share in kind (right of way, station land) | With federal funds (Buy America) |
|---|---|---|---|---|---|---|---|
| Los Angeles: Sepulveda Pass | 221–251–287 | +40 | 2.7 % | 1.1 % | 16.8 | 36 % | +2.0 % |
| Great Smoky Mountains gateway | 230–264–306 | +42 | 12.5 % | 17.3 % | 0.0 | 4 % | +1.9 % |
| Nashville: airport – downtown | 162–190–223 | +30 | 13.6 % | 19.0 % | 0.0 | 11 % | +1.5 % |
| Little Cottonwood Canyon (Utah) | 228–259–296 | +42 | -1.5 % | -6.3 % | 21.9 | 8 % | +2.2 % |
| Honolulu: Skyline – Waikiki – UH | 159–184–214 | +30 | 6.7 % | 7.5 % | 6.4 | 28 % | +1.0 % |
The investor case is a concession: private capital and debt build and operate the line (about 80 % of the value), and the State and the cities contribute the right of way and the megastation land in kind, with no controlling stake. Fares sit a little above local transit, well below a taxi or a rental car, with premium prices on the leisure routes and a resident discount on a state ID. Where fares and other income do not reach the target return, an availability payment, value capture or federal credit (TIFIA) are the options, each shown with its amount. With federal funds, Buy America applies to the fleet, steel and cables, at the cost shown.
Orlando and Northern California
Orlando Phase I: airport – International Drive – theme parks – downtown
37.8 miles; Phase I US$ 871–978–1,107 M (P10–P50–P90), US$ 25.9 M a mile with stations; 17.8 % equity IRR (base case counts half of the estimated passengers); first service May 2030 (median).
See the proposal →Northern California Phase I: San Jose – Oakland – Vallejo – Fairfield
78.3 miles; Phase I US$ 1,310–1,430–1,560 M (P10–P50–P90), US$ 18.2 M a mile with stations; 4.9 % equity IRR on 70 % of the passengers (14.1 % on all); an availability payment of about US$36-45 M a year gives 12 %; first service May 2030 (median).
See the proposal →What the United States already has, and where Celestavia adds value
- Intercity travel: air, intercity rail and the interstates already serve it; a light line at 70-90 km/h (45-56 mph) competes only on regional trips of up to about an hour.
- Subway trunks: a subway or a heavy-rail line carries tens of thousands of passengers an hour each way; a two-track Celestavia line carries a few thousand with single cabins and about ten thousand with cabins coupled in threes.
- Bulk freight and port volumes: rail and trucks move containers at a fraction of a heavy cable line's cost per box at US port volumes.
- Flat cities with wide roads: a bus rapid transit line does the job for less.
- Inside national parks: the line stops at the gateway towns; the parks' own shuttles serve the inside.
- Mountain passes inside metros: where a rail line would need tunnels, towers follow the freeway or the arterial.
- Ski canyons and park gateways: a few roads carry millions of visitors; park once and ride above the traffic.
- Sun Belt cities without rail: a fixed, visible line from the airport to downtown without a subway.
- River and bay crossings: long spans bank to bank instead of a new bridge.
- Island tourist districts: short links from new rail lines to hotels, beaches and campuses.
Roads: 41,025 people died and 2,442,694 were injured in police-reported crashes in 2023 (NHTSA); the early estimate for 2025 is 36,640 deaths, 1.10 per 100 million vehicle-miles. Railroads: 954 deaths and 6,401 injuries and illnesses in 2025, most of them trespassers and crossing users, – deaths over 2016–2025 (Federal Railroad Administration); transit rail: 222 deaths in 2025 (National Transit Database). Each proposal counts the road deaths and injuries it avoids by taking car trips off the road; zero accidents is the goal of the system’s design.
Places screened, five chosen for a full study
Each place was scored on terrain, the gap in today’s public transport, the size of the flows, Celestavia’s cost and build-speed edge, fit with public plans, and — as a penalty — how good the existing alternative already is. The five studied are the best of five different kinds of place; the ranking holds when the weights are changed.
| # | Place | Kind | Score | What Celestavia adds |
|---|---|---|---|---|
| 1 | Los Angeles: Sepulveda Pass (San Fernando Valley – Westwood / UCLA) | Congested metros where rail is slow or costly to extend | 85 | Valley to Westwood over the pass in about half an hour, years before a tunnelled line, at a fraction of its cost; a feeder to it later. |
| 2 | Great Smoky Mountains gateway: Sevierville – Pigeon Forge – Gatlinburg | National-park and resort gateways choked by cars | 82 | Park the car once at the interstate and ride above the Parkway to the attractions and the park. |
| 3 | Nashville: airport – downtown – across the Cumberland to the East Bank | Sun Belt cities without rail, with an airport link | 69 | A fixed link from the terminal to Broadway and the East Bank, above the traffic. |
| 4 | Salt Lake Valley – Little Cottonwood Canyon (Snowbird, Alta) | Mountain resort corridors | 68 | Valley rail to the resorts in about 20 minutes instead of a long gondola ride, with cargo boxes for the resorts' supplies. |
| 5 | Salt Lake City – Park City over Parleys Canyon (2034 Winter Games venues) | Mountain resort corridors | 68 | A Games legacy link from the city to the mountain venues. |
| 6 | Honolulu: Skyline – Ala Moana – Waikiki – University of Hawaii | Hawaii and Alaska | 65 | The missing link from the rail line to Ala Moana, Waikiki and the university. |
| 7 | Branson: the 76 Strip | National-park and resort gateways choked by cars | 61 | A strip link above the traffic. |
| 8 | Pittsburgh: rivers, bluffs and hilltop neighbourhoods | Mid-size hilly cities | 60 | Hilltop neighbourhoods to river-level jobs; river crossings. |
| 9 | Washington, DC: Georgetown – Rosslyn across the Potomac | River and bay crossings | 58 | A short crossing to the metro. |
| 10 | Miami – Miami Beach over Biscayne Bay | River and bay crossings | 57 | Downtown to the beach above the causeway. |
| 11 | Seattle: West Seattle across the Duwamish | River and bay crossings | 52 | An earlier, cheaper crossing. |
| 12 | Anaheim: ARTIC station – Disneyland Resort – Convention Center | Theme-park and visitor districts | 52 | A fixed link from the regional rail station to the resort and the convention centre. |
| 13 | Austin: airport and downtown | Sun Belt cities without rail, with an airport link | 49 | Feeders to the light rail line; the airport link if phased later. |
| 14 | Juneau: cruise docks – Mendenhall Glacier | Hawaii and Alaska | 49 | A seasonal visitor link. |
Score out of 100. Subway trunks in the largest metros, port container volumes and the national parks’ interiors rank last: existing systems do those jobs well.
Los Angeles: Van Nuys, over the Sepulveda Pass to Westwood and UCLA
The Santa Monica Mountains between the Valley and the Westside: the I-405 climbs about 200 m through the pass; no rail line crosses it. No rail across the pass; buses share the freeway's queues. One of the busiest freeway sections in the country and the region's largest university at the south end.
The region’s chosen rail project for the pass, a tunnelled heavy-rail line forecast at about 121,600 boardings a day, was estimated at about US$ 24.2 billion (2023 dollars) and is expected in the 2030s. The Celestavia base proposal costs about 1 % of that: it can open first and later feed the rail line at Van Nuys and Westwood.

The line on the ground
230 towers (19 a mile, 35 ft tall on average); the ground runs from 294 to 1,190 ft and the steepest kilometre of cable climbs 9 %. Curves sit at stations or on short rail sections (34 along the line). Towers and cables are sized for two loaded cabins on a span, for the local wind and earthquake codes (ASCE 7), with a minimum clearance over the road below.
Three versions, from the lowest price up
| Version | Stations | US$ M, P10–P50–P90 | US$ M a mile with / without stations | First-of-a-kind margin beside | Passengers a day | Benefit / cost | Project return, base |
|---|---|---|---|---|---|---|---|
| Lowest-price proposal | 12 | 159–182–209 | 15.1 / 11.4 | +29 | 4,923–13,700–31,000 | 0.46–1.56–3.82 | 4.9 % |
| Base proposal | 15 | 221–251–287 | 20.9 / 13.5 | +40 | 5,186–14,436–32,594 | 0.37–1.27–3.21 | 2.7 % |
| Full version | 15 | 270–309–355 | 25.6 / 16.2 | +50 | 5,186–14,436–32,594 | 0.32–1.13–2.91 | 1.9 % |
Lowest-price: fewer stations and the opening-year fleet. Base: every station of the density rule, four-space small stations, megastations, own control centre. Full: adds waste and parcel services, the emergency and monitoring package, towers ready for four tracks, an own medium-voltage feeder and backup generation. With federal funds (Buy America) the base version costs US$ 256 M (+2.0 %).
Door to door at the peak
| Trip | Car (min) | Bus or shuttle (min) | Celestavia (min) | Fare, US$ (resident) |
|---|---|---|---|---|
| Van Nuys G Line -> UCLA, 7:30 | 68 | 93 | 30 | 7.35 |
| Sherman Oaks Galleria -> Westwood / VA | 45 | 63 | 21 | 5.59 |
| Van Nuys -> Getty Center | 50 | 70 | 23 | 5.81 |
Capacity and service
At the peak the line runs timetabled cabins that call at the stations along the way; a cabin every 1 minute(s) or better on the busiest stretch, walk-in wait under 1 minutes for 95 % of passengers, a fleet of 70 cabins. Outside the peak, shared cabins pick passengers up on demand. Two tracks carry about 13,035 passengers an hour each way with cabins coupled in threes (the base case needs 624; the high case 1,512). Cabins keep a braking-distance gap to the cabin ahead.
Fares, income and return
Resident fare US$ 2.50 plus US$ 0.40 a mile (up to US$ 7.50); reduced-fare groups pay the local bus fare. Average fare US$ 4.47. Base case income: fares US$ 20.6 M a year, private-cabin bookings US$ 2.0 M, other income net of its cost US$ 2.8 M (sponsorships (events, seasons, app), park-and-ride and ev charging at the megas, small cells / 5g on every 4th tower, station / line naming rights). Operating cost US$ 23.8 M a year: all income covers it 1.1 times. Project return 2.7 %, equity return 1.1 % (low–base–high – / 1.1 % / 22.3 %). In the base case an availability payment of about US$ 16.8 M a year lifts the project return to 10 % (US$ 30.8 M in the low case, US$ 0.0 M in the high case). The State’s right of way and station land, worth about US$ 141 M, would be 36 % of the project’s value, non-controlling.
Public benefit in the base case: 1.45 million hours saved a year, about 3,085 car round trips off the road each day, and 0.2 road deaths and 11 injuries avoided a year. Energy: 0.43 kWh a passenger-mile, 14.0 GWh a year, peak 1.8 MW.
Options, each priced on its own
| Option (against the base proposal) | US$ M, P50 | Share of the base |
|---|---|---|
| Two-space small stations instead of four-space (cheaper) | -0.8 | -0.3 % |
| Fleet and stations for the high demand case | +33.4 | +13.3 % |
| Waste collection service (CV10-W boxes, berths, carriages, transfer point) | +3.2 | +1.3 % |
| Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay) | +2.7 | +1.1 % |
| Emergency and monitoring package (rescue, cameras, sensors) | +4.0 | +1.6 % |
| Towers and foundations ready for 4 tracks from day one | +12.2 | +4.8 % |
| Second pair of tracks later, hung on ready towers | +93.1 | +37.0 % |
| Second pair later without ready towers (second row of towers) | +117.4 | +46.7 % |
| Own medium-voltage feeder on the towers | +5.6 | +2.2 % |
| Backup generation for the peak hour (source open) | +3.7 | +1.5 % |
| Couplers for coupled cabins | +0.3 | +0.1 % |
Great Smoky Mountains gateway: Sevierville, Pigeon Forge, Gatlinburg
The Little Pigeon River valley into the mountains; one road into Gatlinburg. Trolleys in traffic; the Parkway is the only through road. The most visited national park in the country, a theme park and millions of visitors a year on one corridor.
The line ends in Gatlinburg, at the edge of the park; the Spur between Pigeon Forge and Gatlinburg is a national park road, so towers there need the National Park Service’s approval. Visitors park once at the Sevierville gateway and ride above the Parkway. Moving the park and ride out to the I-40 exit 407 is an option of about US$ 91 M.

The line on the ground
281 towers (19 a mile, 34 ft tall on average); the ground runs from 873 to 1,347 ft and the steepest kilometre of cable climbs 4 %. Curves sit at stations or on short rail sections (60 along the line). Towers and cables are sized for two loaded cabins on a span, for the local wind and earthquake codes (ASCE 7), with a minimum clearance over the road below.
Three versions, from the lowest price up
| Version | Stations | US$ M, P10–P50–P90 | US$ M a mile with / without stations | First-of-a-kind margin beside | Passengers a day | Benefit / cost | Project return, base |
|---|---|---|---|---|---|---|---|
| Lowest-price proposal | 9 | 164–188–215 | 12.7 / 9.6 | +30 | 4,677–14,328–31,988 | 0.67–1.94–4.23 | 15.8 % |
| Base proposal | 20 | 230–264–306 | 17.9 / 11.2 | +42 | 5,086–15,612–34,853 | 0.50–1.49–3.35 | 12.5 % |
| Full version | 20 | 284–329–385 | 22.2 / 13.4 | +53 | 5,086–15,612–34,853 | 0.43–1.29–2.94 | 10.7 % |
Lowest-price: fewer stations and the opening-year fleet. Base: every station of the density rule, four-space small stations, megastations, own control centre. Full: adds waste and parcel services, the emergency and monitoring package, towers ready for four tracks, an own medium-voltage feeder and backup generation. With federal funds (Buy America) the base version costs US$ 269 M (+1.9 %).
Door to door at the peak
| Trip | Car (min) | Bus or shuttle (min) | Celestavia (min) | Fare, US$ (resident) |
|---|---|---|---|---|
| Sevierville gateway -> Gatlinburg downtown, Saturday 10:00 | 88 | 149 | 34 | 10.00 |
| Sevierville gateway -> The Island | 47 | 84 | 21 | 6.09 |
| The Island -> Gatlinburg downtown | 49 | 88 | 22 | 7.05 |
Capacity and service
At the peak the line runs timetabled cabins that call at the stations along the way; a cabin every 1 minute(s) or better on the busiest stretch, walk-in wait under 1 minutes for 95 % of passengers, a fleet of 80 cabins. Outside the peak, shared cabins pick passengers up on demand. Two tracks carry about 12,981 passengers an hour each way with cabins coupled in threes (the base case needs 597; the high case 1,445). Cabins keep a braking-distance gap to the cabin ahead.
Fares, income and return
Resident fare US$ 3.00 plus US$ 0.48 a mile (up to US$ 10.00); reduced-fare groups pay the local bus fare. Average fare US$ 6.80. Base case income: fares US$ 36.6 M a year, private-cabin bookings US$ 3.5 M, other income net of its cost US$ 2.7 M (small cells / 5g on every 4th tower, sponsorships (events, seasons, app), park-and-ride and ev charging at the megas, station / line naming rights). Operating cost US$ 18.6 M a year: all income covers it 2.3 times. Project return 12.5 %, equity return 17.3 % (low–base–high -7.7 % / 17.3 % / 46.6 %). Fares and other income cover the operating cost and repay the capital at a 10 % project return in the base case without a public payment. The State’s right of way and station land, worth about US$ 10 M, would be 4 % of the project’s value, non-controlling.
Public benefit in the base case: 1.87 million hours saved a year, about 1,817 car round trips off the road each day, and 0.1 road deaths and 6 injuries avoided a year. Energy: 0.36 kWh a passenger-mile, 9.0 GWh a year, peak 2.2 MW.
Options, each priced on its own
| Option (against the base proposal) | US$ M, P50 | Share of the base |
|---|---|---|
| Two-space small stations instead of four-space (cheaper) | -0.8 | -0.3 % |
| Fleet and stations for the high demand case | +42.3 | +16.0 % |
| Waste collection service (CV10-W boxes, berths, carriages, transfer point) | +3.9 | +1.5 % |
| Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay) | +3.1 | +1.2 % |
| Emergency and monitoring package (rescue, cameras, sensors) | +4.3 | +1.6 % |
| Towers and foundations ready for 4 tracks from day one | +9.4 | +3.5 % |
| Second pair of tracks later, hung on ready towers | +106.8 | +40.4 % |
| Second pair later without ready towers (second row of towers) | +125.4 | +47.4 % |
| Own medium-voltage feeder on the towers | +5.9 | +2.2 % |
| Backup generation for the peak hour (source open) | +4.1 | +1.5 % |
| Couplers for coupled cabins | +0.4 | +0.1 % |
| Extension of 8.1 mi to I-40 exit 407, the park and ride moved there (estimate: the line's own cost a mile without stations) | +91.0 | +34.4 % |
Nashville: the airport, the East Bank and downtown
Rolling ground and the Cumberland River between downtown and the East Bank. No rail to the airport or across the city; buses in general traffic. A fast-growing metro, a busy airport and millions of visitors a year downtown.
Nashville’s 2024 transit programme (US$ 3.1 billion, approved by 66 % of voters) builds buses, sidewalks and signals but no rail; the line adds a fixed link from the terminal to the East Bank, Broadway and the Music City Center, crossing the Cumberland River in one span.

The line on the ground
129 towers (18 a mile, 32 ft tall on average); the ground runs from 385 to 574 ft and the steepest kilometre of cable climbs 3 %. Curves sit at stations or on short rail sections (30 along the line). It crosses the Cumberland River bank to bank in one long span. Towers and cables are sized for two loaded cabins on a span, for the local wind and earthquake codes (ASCE 7), with a minimum clearance over the road below.
Three versions, from the lowest price up
| Version | Stations | US$ M, P10–P50–P90 | US$ M a mile with / without stations | First-of-a-kind margin beside | Passengers a day | Benefit / cost | Project return, base |
|---|---|---|---|---|---|---|---|
| Lowest-price proposal | 7 | 99–114–132 | 16.3 / 11.6 | +18 | 6,448–13,159–23,332 | 0.61–1.56–3.25 | 20.2 % |
| Base proposal | 16 | 162–190–223 | 27.1 / 15.0 | +30 | 6,682–13,820–24,824 | 0.39–1.06–2.36 | 13.6 % |
| Full version | 16 | 191–223–263 | 31.9 / 18.0 | +36 | 6,682–13,820–24,824 | 0.35–0.96–2.16 | 12.2 % |
Lowest-price: fewer stations and the opening-year fleet. Base: every station of the density rule, four-space small stations, megastations, own control centre. Full: adds waste and parcel services, the emergency and monitoring package, towers ready for four tracks, an own medium-voltage feeder and backup generation. With federal funds (Buy America) the base version costs US$ 192 M (+1.5 %).
Door to door at the peak
| Trip | Car (min) | Bus or shuttle (min) | Celestavia (min) | Fare, US$ (resident) |
|---|---|---|---|---|
| BNA terminal -> Lower Broadway, 17:00 | 36 | 63 | 20 | 5.72 |
| BNA terminal -> Music City Center | 37 | 66 | 21 | 5.88 |
| Elm Hill Pike hotels -> East Bank stadium | 28 | 51 | 17 | 4.76 |
Capacity and service
At the peak the line runs timetabled cabins that call at the stations along the way; a cabin every 1 minute(s) or better on the busiest stretch, walk-in wait under 1 minutes for 95 % of passengers, a fleet of 69 cabins. Outside the peak, shared cabins pick passengers up on demand. Two tracks carry about 13,039 passengers an hour each way with cabins coupled in threes (the base case needs 681; the high case 1,307). Cabins keep a braking-distance gap to the cabin ahead.
Fares, income and return
Resident fare US$ 2.50 plus US$ 0.48 a mile (up to US$ 7.00); reduced-fare groups pay the local bus fare. Average fare US$ 6.48. Base case income: fares US$ 30.9 M a year, private-cabin bookings US$ 2.9 M, other income net of its cost US$ 2.3 M (sponsorships (events, seasons, app), park-and-ride and ev charging at the megas, station / line naming rights, mega transit-building retail and concessions (15 % of floor)). Operating cost US$ 17.0 M a year: all income covers it 2.1 times. Project return 13.6 %, equity return 19.0 % (low–base–high 2.7 % / 19.0 % / 40.8 %). Fares and other income cover the operating cost and repay the capital at a 10 % project return in the base case without a public payment. The State’s right of way and station land, worth about US$ 24 M, would be 11 % of the project’s value, non-controlling.
Public benefit in the base case: 0.57 million hours saved a year, about 2,076 car round trips off the road each day, and 0.2 road deaths and 12 injuries avoided a year. Energy: 0.44 kWh a passenger-mile, 10.5 GWh a year, peak 1.8 MW.
Options, each priced on its own
| Option (against the base proposal) | US$ M, P50 | Share of the base |
|---|---|---|
| Two-space small stations instead of four-space (cheaper) | -0.9 | -0.5 % |
| Fleet and stations for the high demand case | +17.9 | +9.4 % |
| Waste collection service (CV10-W boxes, berths, carriages, transfer point) | +3.3 | +1.8 % |
| Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay) | +2.9 | +1.5 % |
| Emergency and monitoring package (rescue, cameras, sensors) | +2.8 | +1.5 % |
| Towers and foundations ready for 4 tracks from day one | +4.3 | +2.3 % |
| Second pair of tracks later, hung on ready towers | +74.2 | +39.1 % |
| Second pair later without ready towers (second row of towers) | +82.8 | +43.7 % |
| Own medium-voltage feeder on the towers | +3.6 | +1.9 % |
| Backup generation for the peak hour (source open) | +3.3 | +1.7 % |
| Couplers for coupled cabins | +0.3 | +0.2 % |
Utah: the Salt Lake Valley to Little Cottonwood Canyon
A glacial canyon climbing about 900 m in 13 km, crossed by dozens of avalanche paths. Ski buses share the one road; it closes for avalanche control. Two resorts with over a million skier visits a season, peaky by day and hour.
The State’s chosen gondola (2023 Record of Decision) would carry about 1,050 people an hour each way, about 37 minutes from its base to Alta, for about US$ 729 M in 2022 dollars, and is not funded; the canyon road closes for avalanche control about 56 hours a year. The Celestavia line starts at the valley’s rail station and reaches Snowbird from the canyon mouth in about 20 minutes, for about a third of the gondola’s cost.

The line on the ground
261 towers (19 a mile, 40 ft tall on average); the ground runs from 4,443 to 8,709 ft and the steepest kilometre of cable climbs 18 %. Curves sit at stations or on short rail sections (55 along the line). Towers and cables are sized for two loaded cabins on a span, for the local wind and earthquake codes (ASCE 7), with a minimum clearance over the road below.
Three versions, from the lowest price up
| Version | Stations | US$ M, P10–P50–P90 | US$ M a mile with / without stations | First-of-a-kind margin beside | Passengers a day | Benefit / cost | Project return, base |
|---|---|---|---|---|---|---|---|
| Lowest-price proposal | 5 | 161–182–207 | 13.3 / 10.9 | +29 | 1,824–3,989–7,023 | 0.28–0.69–1.37 | -1.4 % |
| Base proposal | 12 | 228–259–296 | 19.0 / 12.7 | +42 | 2,264–5,168–9,534 | 0.23–0.57–1.15 | -1.5 % |
| Full version | 12 | 274–312–358 | 22.8 / 15.3 | +50 | 2,264–5,168–9,534 | 0.20–0.50–1.02 | -2.0 % |
Lowest-price: fewer stations and the opening-year fleet. Base: every station of the density rule, four-space small stations, megastations, own control centre. Full: adds waste and parcel services, the emergency and monitoring package, towers ready for four tracks, an own medium-voltage feeder and backup generation. With federal funds (Buy America) the base version costs US$ 265 M (+2.2 %).
Door to door at the peak
| Trip | Car (min) | Bus or shuttle (min) | Celestavia (min) | Fare, US$ (resident) |
|---|---|---|---|---|
| Sandy Civic Center TRAX -> Alta, powder Saturday 8:00 | 99 | 165 | 31 | 12.00 |
| Canyon mouth -> Snowbird | 71 | 119 | 20 | 8.77 |
| 9400 South -> Snowbird | 78 | 131 | 23 | 10.07 |
Capacity and service
At the peak the line runs timetabled cabins that call at the stations along the way; a cabin every 1 minute(s) or better on the busiest stretch, walk-in wait under 1 minutes for 95 % of passengers, a fleet of 99 cabins. Outside the peak, shared cabins pick passengers up on demand. Two tracks carry about 12,762 passengers an hour each way with cabins coupled in threes (the base case needs 956; the high case 1,878). Cabins keep a braking-distance gap to the cabin ahead. About 205 visitors a day ride up the canyon for the view in summer (US$ 25 return).
Fares, income and return
Resident fare US$ 4.00 plus US$ 0.64 a mile (up to US$ 12.00); reduced-fare groups pay the local bus fare. Average fare US$ 12.05. Base case income: fares US$ 11.8 M a year, private-cabin bookings US$ 1.0 M, other income net of its cost US$ 2.4 M (sponsorships (events, seasons, app), small cells / 5g on every 4th tower, park-and-ride and ev charging at the megas, station / line naming rights). Operating cost US$ 16.3 M a year: all income covers it 0.9 times. Project return -1.5 %, equity return -6.3 % (low–base–high – / -6.3 % / 9.2 %). In the base case an availability payment of about US$ 21.9 M a year lifts the project return to 10 % (US$ 30.3 M in the low case, US$ 6.2 M in the high case). The State’s right of way and station land, worth about US$ 23 M, would be 8 % of the project’s value, non-controlling.
Public benefit in the base case: 0.69 million hours saved a year, about 860 car round trips off the road each day, and 0.0 road deaths and 2 injuries avoided a year. Energy: 0.32 kWh a passenger-mile, 2.6 GWh a year, peak 4.5 MW.
Options, each priced on its own
| Option (against the base proposal) | US$ M, P50 | Share of the base |
|---|---|---|
| Two-space small stations instead of four-space (cheaper) | -0.8 | -0.3 % |
| Fleet and stations for the high demand case | +25.8 | +10.0 % |
| Waste collection service (CV10-W boxes, berths, carriages, transfer point) | +3.5 | +1.3 % |
| Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay) | +2.5 | +1.0 % |
| Emergency and monitoring package (rescue, cameras, sensors) | +4.1 | +1.6 % |
| Towers and foundations ready for 4 tracks from day one | +11.6 | +4.5 % |
| Second pair of tracks later, hung on ready towers | +94.6 | +36.5 % |
| Second pair later without ready towers (second row of towers) | +117.8 | +45.4 % |
| Own medium-voltage feeder on the towers | +5.5 | +2.1 % |
| Backup generation for the peak hour (source open) | +8.3 | +3.2 % |
| Couplers for coupled cabins | +0.4 | +0.2 % |
Honolulu: Skyline, Ala Moana, Waikiki and the University of Hawaii
A coastal plain, the Ala Wai Canal and the Manoa valley. The new rail line ends short of Ala Moana, Waikiki and the university. Tens of thousands of visitors a day in Waikiki and a large campus.
The Skyline rail line reaches Civic Center around 2031; its Kakaʻako and Ala Moana stations are deferred and there is no funded plan to reach Waikīkī or the university. The line runs along the Ala Wai Canal behind Waikīkī, not on Kalākaua Avenue.

The line on the ground
105 towers (20 a mile, 28 ft tall on average); the ground runs from -9 to 66 ft and the steepest kilometre of cable climbs 2 %. Curves sit at stations or on short rail sections (8 along the line). Towers and cables are sized for two loaded cabins on a span, for the local wind and earthquake codes (ASCE 7), with a minimum clearance over the road below.
Three versions, from the lowest price up
| Version | Stations | US$ M, P10–P50–P90 | US$ M a mile with / without stations | First-of-a-kind margin beside | Passengers a day | Benefit / cost | Project return, base |
|---|---|---|---|---|---|---|---|
| Lowest-price proposal | 10 | 92–107–126 | 20.9 / 14.0 | +17 | 4,511–11,793–25,100 | 0.52–1.49–3.38 | 11.2 % |
| Base proposal | 14 | 159–184–214 | 35.8 / 19.4 | +30 | 4,731–12,281–25,942 | 0.38–1.10–2.53 | 6.7 % |
| Full version | 14 | 196–228–267 | 44.3 / 23.2 | +37 | 4,731–12,281–25,942 | 0.33–0.97–2.25 | 5.5 % |
Lowest-price: fewer stations and the opening-year fleet. Base: every station of the density rule, four-space small stations, megastations, own control centre. Full: adds waste and parcel services, the emergency and monitoring package, towers ready for four tracks, an own medium-voltage feeder and backup generation. With federal funds (Buy America) the base version costs US$ 186 M (+1.0 %).
Door to door at the peak
| Trip | Car (min) | Bus or shuttle (min) | Celestavia (min) | Fare, US$ (resident) |
|---|---|---|---|---|
| Waikiki centre -> Civic Center (Skyline), 17:00 | 26 | 46 | 14 | 4.23 |
| Waikiki centre -> Ala Moana Center | 17 | 32 | 11 | 3.62 |
| Civic Center -> University of Hawaii | 45 | 77 | 19 | 5.48 |
Capacity and service
At the peak the line runs timetabled cabins that call at the stations along the way; a cabin every 1 minute(s) or better on the busiest stretch, walk-in wait under 1 minutes for 95 % of passengers, a fleet of 27 cabins. Outside the peak, shared cabins pick passengers up on demand. Two tracks carry about 14,778 passengers an hour each way with cabins coupled in threes (the base case needs 408; the high case 930). Cabins keep a braking-distance gap to the cabin ahead.
Fares, income and return
Resident fare US$ 3.00 plus US$ 0.48 a mile (up to US$ 6.00); reduced-fare groups pay the local bus fare. Average fare US$ 4.41. Base case income: fares US$ 18.9 M a year, private-cabin bookings US$ 1.8 M, other income net of its cost US$ 2.2 M (sponsorships (events, seasons, app), park-and-ride and ev charging at the megas, station / line naming rights, mega transit-building retail and concessions (15 % of floor)). Operating cost US$ 16.7 M a year: all income covers it 1.4 times. Project return 6.7 %, equity return 7.5 % (low–base–high – / 7.5 % / 31.4 %). In the base case an availability payment of about US$ 6.4 M a year lifts the project return to 10 % (US$ 21.3 M in the low case, US$ 0.0 M in the high case). The State’s right of way and station land, worth about US$ 70 M, would be 28 % of the project’s value, non-controlling.
Public benefit in the base case: 1.23 million hours saved a year, about 1,127 car round trips off the road each day, and 0.0 road deaths and 2 injuries avoided a year. Energy: 0.34 kWh a passenger-mile, 2.7 GWh a year, peak 0.5 MW.
Options, each priced on its own
| Option (against the base proposal) | US$ M, P50 | Share of the base |
|---|---|---|
| Two-space small stations instead of four-space (cheaper) | -1.1 | -0.6 % |
| Fleet and stations for the high demand case | +27.0 | +14.6 % |
| Waste collection service (CV10-W boxes, berths, carriages, transfer point) | +3.0 | +1.6 % |
| Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay) | +2.7 | +1.4 % |
| Emergency and monitoring package (rescue, cameras, sensors) | +2.7 | +1.5 % |
| Towers and foundations ready for 4 tracks from day one | +5.1 | +2.7 % |
| Second pair of tracks later, hung on ready towers | +61.2 | +33.3 % |
| Second pair later without ready towers (second row of towers) | +71.2 | +38.7 % |
| Own medium-voltage feeder on the towers | +3.8 | +2.1 % |
| Backup generation for the peak hour (source open) | +1.2 | +0.7 % |
| Couplers for coupled cabins | +0.1 | +0.1 % |
Celestavia beside light rail, bus rapid transit, streetcars, monorails, gondolas and people movers
| System | Miles | US$ M a mile | Notes | Year | Source |
|---|---|---|---|---|---|
| Celestavia, Los Angeles: Sepulveda Pass (base proposal) | 12.1 | 20.9 (13.5 without stations) | 13,035 passengers an hour each way with cabins coupled in threes | 2026 | Celestavia study |
| Celestavia, Great Smoky Mountains gateway (base proposal) | 14.8 | 17.9 (11.2 without stations) | 12,981 passengers an hour each way with cabins coupled in threes | 2026 | Celestavia study |
| Celestavia, Nashville: airport – downtown (base proposal) | 7.0 | 27.1 (15.0 without stations) | 13,039 passengers an hour each way with cabins coupled in threes | 2026 | Celestavia study |
| Celestavia, Little Cottonwood Canyon (Utah) (base proposal) | 13.7 | 19.0 (12.7 without stations) | 12,762 passengers an hour each way with cabins coupled in threes | 2026 | Celestavia study |
| Celestavia, Honolulu: Skyline – Waikiki – UH (base proposal) | 5.1 | 35.8 (19.4 without stations) | 14,778 passengers an hour each way with cabins coupled in threes | 2026 | Celestavia study |
| Light rail: Austin Project Connect, phase 1 | 9.8 | 836.7 | estimate, year-of-expenditure dollars | 2026 | KXAN |
| Light rail: Phoenix South Central extension | 5.5 | 243.6 | opened 2025 | 2025 | City of Phoenix newsroom (South Central Extension/Downtown Hub opens 7 Jun 2025); Construction Dive and Railway Age (Jun 2025); FTA FFGA project profile |
| Light rail: Los Angeles K Line | 8.5 | 288.0 | final project budget | 2023 | LA Metro Board report file 2023-0529 |
| Light rail: Seattle Lynnwood Link | 8.5 | 326.1 | baseline budget (2018) | 2018 | Sound Transit Board Resolution R2018-16 (May 2018) and FTA Lynnwood Link Extension FFGA project profile |
| Light rail: West Seattle Link extension | 3.9 | 1,794.9 | estimate; opening about 2035 | 2026 | The Seattle Times (M. Lindblom |
| Automated metro: Honolulu Skyline | 18.8 | 537.5 | full line to Civic Center, incl. financing | 2025 | Honolulu Authority for Rapid Transportation (HART) amended total project cost (2025) |
| Heavy rail: LA Sepulveda Transit Corridor | 13.0 | 1,861.5 | tunnelled option, 2023 dollars; chosen route Jan 2026, cost to be updated | 2023 | LA Metro |
| Light rail: Maryland Purple Line | 16.2 | – | US$9.53 bn covers building and operating to 2057 with financing: not a capital cost | 2024 | Maryland MTA request to the Board of Public Works |
| Bus rapid transit: Indianapolis Red Line | 13.1 | 7.4 | opened 2019 | 2019 | Indianapolis Star (4 May 2018) |
| Bus rapid transit: Richmond Pulse | 6.8 | 9.6 | opened 2018 | 2018 | GRTC / Richmond.com (2018) |
| Bus rapid transit: San Antonio Green Line | 12.0 | 40.1 | estimate at 40 % design | 2024 | VIA Metropolitan Transit |
| Streetcar: Tempe | 3.0 | 66.7 | opened 2022 | 2022 | Wikipedia 'Tempe Streetcar' (Valley Metro sources) |
| Streetcar: Kansas City Main Street extension | 3.5 | 100.0 | opened 2025 | 2025 | KSHB 41 (14 May 2025 and 19 Oct 2025); Kansas City Star (24 Oct 2025) |
| Streetcar: OC Streetcar | 4.2 | 156.4 | estimate, opening 2027 | 2025 | OCTA |
| Monorail: Las Vegas | 3.9 | 166.7 | cost when built (2004) | 2004 | Los Angeles Times (3 Sep 2020) |
| Aerial gondola: Little Cottonwood Canyon (State's choice) | 8.0 | 91.1 | 2022 dollars; about 1,050 people an hour each way; not funded | 2022 | Utah DOT |
| Aerial gondola: LA Union Station – Dodger Stadium | 1.2 | 416.7 | estimate; stalled | 2025 | Time Out Los Angeles |
| Aerial tram: Portland | 0.6 | 91.2 | final cost (2006) | 2006 | Wikipedia 'Portland Aerial Tram' (City of Portland / OHSU sources); FTA NTD 2025 annual data |
| People mover: LAX | 2.2 | 844.4 | initial design and construction about US$1.9 bn (the 25-year contract with operations is US$4.9 bn); not yet open | 2018 | LA Times (11 Apr 2018 |
| Tunnel loop: Las Vegas Convention Center | 1.7 | 28.6 | construction contract (2019) | 2019 | Bloomberg (29 May 2019); Las Vegas Review-Journal and TechCrunch (2021) |
| People mover: Detroit | 2.9 | 76.2 | 1987 dollars | 1987 | Historic Detroit |
A subway or a light rail line carries more people an hour than a two-track Celestavia line and is the right choice for a city’s busiest trunk; a bus rapid transit line costs less on flat, wide streets. Celestavia’s case is a lower cost a mile where rail needs tunnels, viaducts or a dedicated street; towers on small footprints; stations every few hundred yards; cabins much faster than an aerial gondola’s; and a line that grows a cabin at a time. Costs from different years and scopes are shown as published (some include operations or financing, as noted).
Why port container shuttles are not proposed
US ports move containers by on-dock rail and trucks at low cost. A two-lane Celestavia heavy line at about US$ 69 M a mile would cost, for its capital alone, about US$ 1.11 a ton-mile at 5 million tons a year — 9 times a truck’s operating cost of about US$ 0.12 — and would match it only above roughly 47 million tons a year. Light 10-ft boxes for parcels, resort supplies and waste ride the passenger lines instead, as options on each proposal.
Electric, 1.5 kV DC, with the source left open
Each line takes 1.5 kV DC from substations along it, on two contact wires; the cables carry no current. Braking energy goes back to the line, or to an on-board braking resistor when the line cannot take it. The five base proposals together use about 39 GWh a year, billed at each state’s commercial tariff in the operating cost. The source is a choice: the local utility, the line’s own medium-voltage feeder on the towers, or backup generation — each priced as an option. Every tower carries a battery for at least 21 days of sensors, cameras and communications without grid power.
Earthquakes, wildfire, snow and avalanches, floods, hurricanes
Operation steps down in levels — full, partial, secured, rescue — as wind, ice, fire or seismic sensors on every tower report. Los Angeles and the Wasatch Front: towers sized for the local earthquake codes, with automatic stops on a seismic alert. Southern California and the Smokies: wildfire cameras on the towers and evacuation runs before a fire reaches the line. Little Cottonwood Canyon: towers sited outside the avalanche paths, cables and cabins designed for snow and ice, the line kept running when the road is closed for avalanche control wherever the study confirms it. Tennessee: towers and stations above the flood levels. Honolulu: hurricane wind design, cabins brought to stations before a storm, stations above the tsunami inundation level. Passenger service stops at the operating gust limit. Fibre, 5G and cameras along the line report every tower and cabin to the control centre.
Jobs
Building the lines brings work to local crews and suppliers of foundations, steel, cables and electrical works; operating them creates lasting skilled jobs in operation, maintenance and passenger service, with training. The demand for cables, motors, cabins and their materials supports American manufacturing.
First passengers in under five years
Our goal is five years or less from approval to first service. Permits set the pace: where the State, the counties and the cities run the environmental reviews and permits in parallel, design starts at once, financing closes with the permits and the type approval comes from the test line, each line opens about two and a half years after the notice to proceed. Modern tools, artificial intelligence among them, help expedite the studies and reviews.
| Proposal | First service, median | First service, 90th percentile |
|---|---|---|
| Los Angeles: Sepulveda Pass | Apr 2030 | Jul 2030 |
| Great Smoky Mountains gateway | Apr 2030 | Jul 2030 |
| Nashville: airport – downtown | Apr 2030 | Jul 2030 |
| Little Cottonwood Canyon (Utah) | Apr 2030 | Jul 2030 |
| Honolulu: Skyline – Waikiki – UH | Apr 2030 | Jul 2030 |
Months counted from January 2027.
The choices are yours
- Which proposal first: a metro pass (Los Angeles), a park gateway (the Smokies), an airport link (Nashville), a ski canyon (Utah) or an island district (Honolulu) — or a first line in one of them.
- Which version: lowest-price, base or full, and each option on its own.
- Financing: a concession with the State’s right of way and station land in kind; TIFIA and other federal credit; value capture around the stations; an availability payment where a line serves public goals beyond its fares; or a public–private partnership. The local Celestavia company operates the lines.
- Other places: Salt Lake City – Park City for the 2034 Winter Games, Branson, Pittsburgh, Miami Beach, Anaheim, Las Vegas and West Seattle ranked next; the same study can be run for any city.
Celestavia designs the system, its electronics and software, and brings the partners together; towers, cabins, carriages and buildings are made and built by contracted suppliers.
- Method: for each line, today’s door-to-door trips by car, rideshare or taxi, bus or shuttle and on foot are compared with the trip by Celestavia; homes and jobs around every station come from the Census Bureau’s LEHD employment statistics (2023); capacity, fleet and stations follow from the peak hour; cost ranges come from thousands of draws of every unit price at each state’s price level; the return and the benefit/cost follow the federal benefit-cost guidance. Alignments are drawn on the terrain model between existing places and are not surveyed.
- Census Bureau (population estimates 2025; ACS 2025; LEHD employment statistics 2023); FHWA Highway Statistics (2024, 2025); National Transit Database (2025); NHTSA (2023 final, 2025 early estimate); Federal Railroad Administration (2016–2025); EIA Electric Power Annual 2025; EPA eGRID2023; US DOT Benefit-Cost Analysis Guidance (December 2025); 49 U.S.C. 5323(j) and the Build America, Buy America Act; NEPA as amended in 2023; ATRI (2026).
- Local figures: Caltrans, LA Metro, UCLA; National Park Service, Sevier County and Tennessee tourism, TDOT; Utah DOT (Little Cottonwood Canyon Record of Decision, 2023), Utah Transit Authority, Ski Utah; Nashville International Airport, Metro Nashville; Honolulu Authority for Rapid Transportation, Hawaii Tourism Authority, University of Hawaii. Costs of other systems: the transit agencies and the press as listed. Terrain: Copernicus GLO-30 (European Space Agency).
- Data to request later: regional travel-survey trip tables and ridership by stop, visitor travel surveys, right-of-way and airspace terms, geotechnical and utility records, local unit prices and supplier quotes.
Projections, not guarantees: every project figure on this page is simulated for this concept study (22 November 2026); costs are ranges until suppliers quote.
© Global Genius Trust y Celestavia Co.
Join us
Join Celestavia
Public authorities, transport operators, business people and the general public are invited to learn about the proposal, share their ideas and join in. Sign up and we will keep you posted on the project.