Celestavia is elevated electric transport: the carriage drives on its own motors along two large fixed steel ropes; the chassis rides on top and the cabin hangs below, separate. It is not a cable car, and these are not power lines.
Phase I has 2 lines, 73.1 km and 83 stations: Colonial City – Los Héroes along 27 de Febrero, and Cap Cana – Punta Cana Airport – Bávaro – El Macao. Projections, not guarantees.