Celestavia: Heavy Cargo Over the Mountain

About Investors Government Heavy Cargo Contact Español
Concept image of a Celestavia heavy line climbing a forested mountain: two tracks of four fixed high-strength steel cables on tall portal towers; on one track two electric carriages carry a bulk box hanging below, on the other a fuel tank comes down. Labels point to the carriages, the cables, the tower, the bulk box and the fuel tank.
Celestavia · Heavy cargo options

Heavy cargo over the mountain

Sand, rock, ore and fuel, in standard containers, on an electric line that climbs where roads and railways cannot. Celestavia is not a cable car and not a power line: the steel cables are fixed, and a self-propelled electric carriage runs on them with the container hanging below.

This page shows the options Celestavia can offer for mining and fuel lines. Each project chooses its own after its route study.

44.2 tdesign gross per box (48.7 short tons): a full 40-ft fuel tank
~40 %steepest grade on the set’s own wheels (wet cable)
2,232 t/hone track, one set a minute (16.7 Mt a year)
1.5 kV DCelectric traction; energy returned on the way down
Film

Heavy cargo: the film

Containers, tanks and bulk boxes above roads, rivers and forest, around the clock: how a Celestavia heavy-cargo line works, in under three minutes.

Options · containers

The right box for each cargo

Two heavy carriages take one 20-ft or longer box by its standard corner fittings; a 10-ft box rides one carriage. Every box keeps a standard footprint. Dense ore fills a low box before it is full; sand and rock need a tall one; coal needs a 40-ft box. The box opens through its floor straight into a bunker, or is turned over by a port spreader.

BoxDry silica sand, tGravel / rock, tIron ore, tCoal, tBest for
10-ft bulk box, floor gate, one carriage18.218.218.210.9closed mine shuttle; spreads the load on the cables
20-ft half-height 1.45 m22.823.635.312.5today’s market ore box; ports with rotating spreaders
20-ft mid-height 1.75 m28.028.939.015.3dense ore and concentrate
20-ft full-height 2.59 m37.737.737.722.2sand and rock
20-ft high-cube 2.90 m37.237.237.225.4sand and crushed rock, with a hard lid
40-ft full-height36.436.436.436.4coal and other light bulk

Payload per set at the 44.2 t design gross, box filled to 95 %. Ratings offered: ISO 36 t gross (for boxes that also travel by ship or public rail) and 44.2 t gross on mining and fuel lines. Flatbeds carry vehicles and machinery.

Options · fuels and gases

Diesel, gasoline, propane and liquefied gas

Fuels travel in certified tank containers built to the international dangerous-goods rules for sea, rail and road. Every tank below travels full. One 40-ft diesel tank every two minutes on one track is about 31.5 million litres a day (8.3 million US gallons; about 198,000 barrels).

Tank containerLoadFuel, tGross, t
20-ft T11 26,000 L, gasoline24,700 L (6,525 gal)18.422.4
20-ft T11 26,000 L, diesel24,700 L (6,525 gal)20.724.7
40-ft tank 46,000 L, gasoline43,700 L (11,544 gal)32.640.1
40-ft tank 46,000 L, diesel43,700 L (11,544 gal)36.744.2
20-ft T50 24,600 L, propane24,600 L (6,499 gal)10.317.4
40-ft T50 52,500 L, propane52,500 L (13,869 gal)22.136.0
40-ft cryogenic 43,500 L, LNG (90 %)39,150 L (10,342 gal)16.827.8

Safety options for fuel lines

  • Track use: cargo-only tracks; shared tracks off-peak with spacing; or dedicated fuel lines.
  • Spacing between tank sets, and no stopping over homes, schools or water intakes.
  • Baffled or fully filled tanks, so the liquid does not surge under a hanging carriage.
  • Leak, heat and gas sensors on the carriage and on every tower; automatic stop and isolation.
  • Terminals with hazardous-area zoning, vapour recovery and spill containment.

Dangerous goods on a new kind of line need their own safety case and approval in each country. Not a litre moves before both exist.

Options · loading and unloading

Unloads from the air, connects to rail and ships

Floor doors over a bunker

The box already hangs in the air, so it opens its floor straight into a bunker in about a minute. No ramp, no tipping truck, no crane.

Rotation at a port

Where a port already turns ore boxes over with rotating spreaders, the same box is emptied the usual way.

Rail and quay transfer

At a transfer siding the container is lifted straight off a wagon or a quay and onto the line, and carried on to the mine, the plant or the ship. Celestavia connects railways and ports; it does not replace them.

Drop-down to the ground

A carriage winch can lower a box to a ground pad at a tower, anywhere on the line.

Options · mountains

Built for mountain grades

The steel cables are fixed; the carriage drives along them. Every wheel station grips the cable from both sides: a drive wheel on top and a clamp roller pressing from below, with one motor per wheel on all sixteen wheels of each carriage. On the mountain route we studied, the hilly part averages about 12 %, a typical climb is about 14 % for under a kilometre, and 99 % of the line is under about 35 %.

Drive option, loaded 44.2 t boxSteepest grade, wet cableIcy cable
Wheel stations rated 40 kN, driven clamp roller (20 kN)about 40 %about 35 %
Stronger clamp (30 kN)about 50 %about 42 %
Traction cables or a haul cable on a short stretchfor the rare steeper spans, or re-align the line

Carriage weight is still being set (3.5 to 11.9 t): the wet-cable limit moves from about 44 % to 33 %. Grades include the extra slope of the cable near each tower. The steepest grades are to be confirmed on the test rig.

Line length to climb 1,000 m

Options · speed

Speed: the towers set the limit on the flat, the motors on the hills

On the flat, the limit is how gently the cable bends over each tower, not the motors. A loaded set runs at about 59 km/h (37 mph) on standard 13 m cable supports and about 79 km/h (49 mph) on 24 m crest rails; the system top speed is 90 km/h (56 mph). On the hills, speed depends on the motor and braking options.

0204060800 %5 %10 %15 %20 %25 %30 %km/h
  • Empty set, climbing
  • Loaded set, descending (base braking)
  • Loaded set, climbing (base motors)
  • Horizontal: line grade

Loaded 44.2 t box over a 237 km mountain-and-lowland route we studied, with each option:

OptionTop speed12 % climb / descentTripAverage
Earlier motor (for reference), 13 m cable supports59 km/h (37 mph)15 / 19 km/h6 h 25 min37 km/h
Base motors (330 hp per carriage), 13 m cable supports59 km/h (37 mph)23 / 28 km/h5 h 21 min44 km/h
Base motors and faster descent, 13 m cable supports59 km/h (37 mph)23 / 49 km/h5 h 00 min47 km/h
Stronger motors (440 hp) and faster descent, 13 m cable supports59 km/h (37 mph)31 / 59 km/h4 h 36 min51 km/h
Strongest motors (550 hp) and faster descent, 13 m cable supports59 km/h (37 mph)38 / 59 km/h4 h 24 min54 km/h
Earlier motor (for reference), 24 m crest rails79 km/h (49 mph)15 / 19 km/h5 h 40 min42 km/h
Base motors (330 hp per carriage), 24 m crest rails79 km/h (49 mph)23 / 28 km/h4 h 34 min52 km/h
Base motors and faster descent, 24 m crest rails79 km/h (49 mph)23 / 49 km/h4 h 11 min56 km/h
Stronger motors (440 hp) and faster descent, 24 m crest rails79 km/h (49 mph)31 / 65 km/h3 h 46 min63 km/h
Strongest motors (550 hp) and faster descent, 24 m crest rails79 km/h (49 mph)38 / 79 km/h3 h 32 min67 km/h

Base motors: one motor per wheel, about 21 hp each, 330 hp per carriage. Faster descent: the motors brake at their peak rating on the short descents, returning the energy to the line or to the on-board braking resistor. Crest rails: longer cable supports at each tower.

Energy

It generates on the way down

Going downhill the motors become generators and return energy to the line. Where loaded boxes come down and empties go back up, grades above about 3.4 % return more energy than the empty sets use. A mine on the mountain powers much of its own line.

Energy returned to the line per round trip (loaded set down, empty set up), in kWh per 1,000 m of descent, at each grade:

-302 %+74 %+196 %+278 %+3312 %+3930 %
Options · capacity

Capacity per track

One set everySets an hourTonnes an hourMillion tonnes a year
30 s1204,46433.5
60 s602,23216.7
120 s301,1168.4
240 s155584.2

37.2 t of bulk per set, 7,500 operating hours a year. The line’s block signalling allows far more sets; the terminals, which load or unload a box in about a minute, set the real figure. More lanes multiply it.

Options · cost ranges

What a heavy line costs

OptionUS$ million per km (low–middle–high)Per lane-km
2 lanes on 2-lane towers21.1–24.3–28.010.6–12.2–14.0
8 lanes on 8-lane towers47.1–53.8–61.35.9–6.7–7.7
Fewer lanes first, on towers built for morestaged with demand

The line alone: towers and foundations, cables, 1.5 kV DC traction power with its own high-voltage feeder, signalling, fibre, 5G and sensors, engineering, land and permits. A loaded set (two carriages) is about US$ 132–193 thousand. Terminals depend on each site (mine, plant, fuel depot, rail or port transfer) and are costed per route.

Low and high: eight in ten combinations of unit prices fall inside the range. Every route is priced with its own terrain and local prices.

Compare

How it compares: Celestavia heavy line, truck and freight rail

Swipe sideways to see all columns →

Celestavia heavy lineTruckFreight rail
What movesElectric carriages on 4 fixed high-strength steel cables per track; the carriage moves, not the cable (these are not power lines)A truck on public roadsTrains on rails
Load per boxUp to 36 t per standard container (ISO 668), and 44.2 t on mining and fuel lines; two carriages, one at each end, for 20-ft and longer boxesOne box per truck; weight capped by road limits (e.g. 80,000 lb ≈ 36.3 t gross, truck included, on US Interstates)[3]Many boxes per train, each within the same ISO limits
Gradesabout 40 % on its own wheels on a wet cable, about 35 % on an icy cable (loaded 44.2 t box); traction cables or a re-aligned line for the rare steeper spans[1]Mountain motorways: 5–6 % at most[2]Main lines: usually 2.2 % or less[4]
Speed90 km/h system top speed; each line’s speed depends on its towers and motorsRoad speed limits and trafficSet by the track and the timetable
Operation24/7 above traffic, floods and level crossingsShares the roads: congestion, closures from floods and landslidesOn the ground: level crossings; floods and landslides can close the line
Energy100 % electric, 1.5 kV DC; braking returns energy to the line; the power source is chosen for each projectMostly diesel todayDiesel or electric, depending on the line
SafetyThe goal is zero accidents: no level crossings, no shared roads, cameras on every towerMixed with cars and peopleLevel crossings where the line runs at ground level
Ground footprintTowers only: the ground below stays open and the forest canopy is keptA continuous paved roadA continuous track bed
Terminal handling≈ 1 minute to set down or pick up a boxGate, queue and crane time at the yardYard and crane time; trains are made up and split
Rivers and valleysLong spans from bank to bank, no towers in the water; the line goes around large wetlands[1]Bridges and embankmentsBridges, viaducts and tunnels
Cost per kmUS$ 21–28 M (2 lanes) or US$ 47–61 M (8 lanes), line only; terminals per route[1]Depends on the road; not compared hereA 2026 South American coast-to-coast railway proposal: ≈ US$ 61–76 M per km, as reported[5]
Sources
  1. Celestavia design studies, 2026: box and carriage rules, grip and grade study, long-span study, line cost model (low–high range of 20,000 price combinations).
  2. WSDOT Design Manual M 22-01.23 (September 2024), Exhibit 1220-2: maximum grades for Interstate highways, mountainous terrain 5–6 % (AASHTO basis). wsdot.wa.gov
  3. US federal vehicle weight limit on the Interstate System: 80,000 lb gross vehicle weight, 23 CFR 658.17. ecfr.gov
  4. Ruling gradient (historical US main-line standard 2.2 %; modern examples 0.4–1.9 %), Wikipedia, accessed November 2026. wikipedia.org
  5. Valora Analitik, 21 May 2026 and 7 September 2026: railway prefeasibility, 222.3 km, reported capital cost about US$ 13.5–16.9 billion (converted from pesos at 4,000 per US$). valoraanalitik.com

Where we are

Celestavia is not yet in operation. Every figure on this page is simulated and shown as a range or an option; each project chooses its own options after its route study. The goal is zero accidents.

Contact

A mine, a plant, a port or a corridor that needs this?

Contact us and we will simulate your route.

Founder / Protector / Trustee

Joel Segurola

Global · Global Genius TrustTelegram: joel.ggtrust (preferred)GlobalGeniusTrust.com
Trustee

Luis Velez

Latin America+593 968 413 677GrupoGenio.com

© Global Genius Trust and Celestavia Co.

Join us

Join Celestavia

Public authorities, transport operators, business people and the general public are invited to learn about the proposal, share their ideas and join in. Sign up and we will keep you posted on the project.

Celestavia: Join (en, all pages)
Type the result to confirm you are not a robot.