---
title: "Celestavia: Singapore – Celestavia Personal & Cargo Rapid Transit"
description: "Celestavia in Singapore: where the elevated electric cable system fits beside the MRT (green links, campuses, industrial estates, the waterfront) and four proposals for government and investors: th..."
canonical: "https://celestavia.com/en/singapore/"
language: "en"
last-updated: "2026-11-25"
site: "Celestavia - Personal & Cargo Rapid Transit"
status-note: "Corridor pages describe proposals and route studies, not scheduled construction."
---

# Celestavia: Singapore

[About](https://celestavia.com/en/#what)
[Investors](https://celestavia.com/en/investors/)
[Government](https://celestavia.com/en/government/)
[Heavy Cargo](https://celestavia.com/en/heavycargo/)
[Contact](https://celestavia.com/en/contact/)
Español

Celestavia · Singapore · Proposals for government and investors

# Where Celestavia fits in Singapore, and four proposals

Electric carriages run on large, fixed high-strength steel cables carried by slim towers above the road verges; a nine-seat passenger cabin or a light 10-ft cargo box hangs below each carriage. 1.5 kV DC, with braking energy returned to the line.

Singapore has one of the densest and best-run rail networks in the world. Celestavia does not compete with the MRT. It fills the gaps the MRT grid leaves on purpose: green links where a road or a viaduct would cut the forest, campuses spread over hills, industrial estates where workers still ride to work on lorry decks, and waterfront links where the view is part of the trip.

**4 proposals**Southern Waterfront, Mandai, Tuas, Kent Ridge: 31 km in all

**US$ 523 M**the four base proposals together (P50, 2026 US$; about S$ 670 M)

**81 thousand**passengers a day in the base case

**Apr 2029**first service (median), under 5 years

ProposalLineBase proposal, US$ M (P10–P50–P90)US$ M per km, with / without stationsPassengers a day (low–base–high)Benefit / cost (low–base–high)

Southern Waterfront6.7 km97.1–**113.7**–133.817.1 / 12.08,790–20,411–36,1570.73–1.99–4.20

Mandai8.5 km91.8–**105.8**–121.912.5 / 9.94,125–9,683–17,1890.50–1.40–3.06

Tuas10.0 km143.1–**173.2**–214.017.4 / 9.09,540–21,980–37,4240.62–1.69–3.50

Kent Ridge5.7 km107.7–**130.3**–159.822.7 / 12.512,887–29,156–50,5971.10–2.54–4.65

Benefit/cost at a 5 % social discount rate. A first-of-a-kind margin is shown beside each total, not inside it. Each proposal also comes as a lowest-price version and a full version, and every extra is priced on its own.

For investors

## The four proposals ranked by investment return, highest first

RankProposalBase proposal, US$ M (P50)Project return, baseEquity return, basePublic or partner payment for a 10 % project returnBenefit / cost

1Southern Waterfront113.716.7 %25.3 %none needed1.99

2Mandai105.83.9 %3.9 %US$ 6.3 M a year1.40

3Tuas173.2-3.4 %-6.6 %US$ 16.4 M a year1.69

4Kent Ridge130.3––US$ 16.9 M a year2.54

The Southern Waterfront line earns its way on Sentosa and waterfront fares. The other three serve public goals beyond their fares — a car-free way into the wildlife reserve, workers off lorry decks, a campus without shuttle buses — and show a benefit/cost above one; each would run on a service contract or an availability payment from the agency, the reserve, the employers or the university that buys the service.

**Project film: to follow**A film for this page will be made after the proposals are reviewed.

A fair reading

## What Singapore already has, and where Celestavia adds value

**271 km**MRT and LRT in operation (2025)

**3.7 million**train trips a day (2025)

**80 %**of homes within a 10-minute walk of a train station: the national goal

**S$ 130,100**the right to own a small car for ten years (2026)

Where it does not add value

- **MRT trunk corridors and the city centre**: an MRT line carries tens of thousands of passengers an hour each way; a two-track Celestavia line carries a few thousand with single cabins and about ten thousand with cabins coupled in threes.

- **Housing estates served by feeder buses**: a feeder bus is cheaper, and towers beside flats raise privacy questions (as the Bukit Panjang LRT's frosted windows show).

- **Nature reserves**: Bukit Timah and the Central Catchment core: the line stays on existing road corridors.

- **Port containers and hazardous areas**: heavy boxes stay on the port's trucks; Jurong Island's process areas are not a place for an electrified overhead line.

- **Airport surroundings**: obstacle limitation surfaces cap tower heights near Changi and Seletar.

Where it does

- **Green links**: MRT to the Mandai parks above the road verge, the canopy kept, no widening.

- **Campuses and business parks on hills**: Kent Ridge: MRT to faculties, hospital and business parks.

- **Industrial estates**: Tuas: dormitory to worksite without lorry decks; light 10-ft boxes for parts and parcels.

- **Waterfront and leisure**: HarbourFront, Sentosa and the new southern waterfront, in stages.

- **Cross-border (option)**: a western link to Johor, if both governments want it.

Roads: 149 deaths and 9,955 injuries in 2025 (Traffic Police). Taking cars, taxis and lorry-deck rides off the roads to the parks, the island and the industrial estates is part of each proposal’s public benefit; zero accidents is the goal of the system’s design.

Screening

## 11 places screened, four chosen for a full study

Each place was scored on terrain, the gap in today’s public transport, the size of the flows, Celestavia’s cost and build-speed edge, fit with national plans, and — as a penalty — how good the existing alternative already is. The city centre, the estates served by feeder buses, the nature reserves and Jurong Island rank last. A western link to Johor ranks fifth: it is a choice for two governments and is shown as an option only.

RankPlaceKindScoreWhat Celestavia adds

1Mandai Wildlife Reserve: Khatib and Springleaf MRT to the parksGreen and nature-reserve links73A quiet electric link from two MRT lines to the park gates above the road verge, the view of the forest as part of the visit, no extra car park, fewer buses on Mandai Lake Road.

2Kent Ridge: NUS, NUH, Science Park and one-northCampuses and business parks on hills52Hill-to-hill circulation in a few minutes at class changes, MRT to every faculty and the hospital without the road, a living test bed for the system.

3Tuas: worker dormitories, industrial estates and light cargo to the portIndustrial estates and port logistics52Dormitory to worksite without lorry decks, at shift times, driverless; light 10-ft boxes for parts, food and parcels between the estates and the port gate.

4Greater Southern Waterfront: HarbourFront, Sentosa and the Keppel – Pasir Panjang shoreLeisure and waterfront links52A waterfront link from HarbourFront to the new districts and the island, sightseeing and daily trips together, built in stages as the land opens.

5Tuas Second Link to Johor (Gelang Patah, Iskandar)Cross-border links to Johor50A western cross-border link for workers, as an option for two governments.

6Lim Chu Kang and Kranji agri-food zoneIndustrial estates and port logistics36Light-box food logistics to the city.

7Jurong Island chemical hubIndustrial estates and port logistics26Little at acceptable cost.

8Changi: Changi Village, Changi Business Park and the airportAirport and eastern links24A village and ferry-point link.

9Bukit Timah and Dairy Farm hillsGreen and nature-reserve links20Little.

10Housing estates beyond a 10-minute walk (e.g. parts of Pasir Ris, Sengkang West, Bukit Batok West)Housing estates far from a station20Little that a feeder bus cannot do.

11City centre, Orchard and the MRT trunk corridorsCity centre and MRT trunk corridors3Nothing the MRT does not already do.

Score out of 100.

Proposal 1 · Leisure and the new waterfront

## Southern Waterfront: Sentosa, HarbourFront, Labrador and Pasir Panjang

The Circle Line runs inland along Pasir Panjang Road; the shore and the new homes of the waterfront are 0.5-1 km from it; Sentosa's monorail is crowded at peaks. Sentosa's visitors (millions a year), VivoCity, the new waterfront homes and offices as they open. A light line along the shore without a viaduct; the view of the harbour sells. The Pasir Panjang part follows the land freed as the port moves to Tuas; the first section is Sentosa – HarbourFront – Labrador.

**6.7 km**9 stations in the base proposal (5 in the lowest-price version)

**US$ 113.7 M**base proposal, P50: US$ 17.1 M per km (12.0 without stations)

**20,411**passengers a day, base case (8,790 low, 36,157 high)

**Apr 2029**first service, median (Jul 2029 at the 90th percentile)

### The line on the ground

71 towers (10.6 a km, 11 m tall on average). Curves sit at stations or on short rail sections (9 along the line). It crosses the Keppel Harbour channel to Sentosa in one long span beside the existing bridges.

### Three versions, from the lowest price up

VersionStationsUS$ M, P10–P50–P90US$ M/km with / without stationsFirst-of-a-kind margin besidePassengers a dayBenefit / costProject return, base

Lowest-price proposal566.2–**76.0**–87.311.4 / 8.5+12.28,456–19,502–34,3510.86–2.32–4.8222.1 %

Base proposal997.1–**113.7**–133.817.1 / 12.0+18.38,790–20,411–36,1570.73–1.99–4.2016.7 %

Full version9118.3–**137.5**–160.820.6 / 14.5+22.18,790–20,411–36,1570.65–1.80–3.8014.7 %

Lowest-price: fewer stations and the opening-year fleet. Base: every station, four-space small stations, own control centre, lightning protection on every tower and storm keepers on every cable support. Full: adds waste and parcel services, emergency and monitoring package, towers ready for four tracks, own medium-voltage feeder and backup generation.

### Door to door at the peak

TripCar (min)Bus or shuttle (min)Celestavia (min)Fare, S$ (resident)

HarbourFront MRT -> Resorts World Sentosa1525**9**1.84

HarbourFront MRT -> Sentosa Beach1628**10**1.92

Haw Par Villa -> HarbourFront2337**13**2.75

### Capacity and service

At the peak the line runs cabins that leave when their passengers are aboard and run non-stop from station to station; average seat use 5.1 of 9, walk-in wait under 3 minutes for 95 % of passengers, a fleet of 92 cabins. Two tracks carry about 12,917 passengers an hour each way with cabins coupled in threes (the base case needs 1,498; the high case 2,840). Cabins keep a braking-distance gap to the cabin ahead. About 877 visitors a day ride the waterfront for the view (S$ 12 return).

### Fares, income and return

Fare S$ 1.50 plus S$ 0.25 a km (up to S$ 4.00). Average fare S$ 3.82. Base case income: fares US$ 22.2 M a year, private-cabin bookings US$ 1.8 M, other income net of its cost US$ 1.9 M (packages and passes (ski / park / attraction bundles), sponsorships (events, seasons, app), sightseeing / attraction tickets and events, in-cabin seatback screens). Operating cost US$ 9.2 M a year: all income covers it 2.8 times. Fares and other income cover the operating cost and repay the capital in the base case without a public payment. In the low case it would be about US$ 6.6 M a year.

Public benefit in the base case: 1.42 million hours saved a year, about 371 car round trips off the road each day, and 1.2 road injuries avoided a year. Energy: 0.12 kWh a passenger-km with the cabin air-conditioning, 1.7 GWh a year, peak 2.1 MW.

### Options, each priced on its own

Option (against the base proposal)US$ M, P50Share of the base

Two-space small stations instead of four-space (cheaper)-0.2-0.2 %

Fleet and stations for the high demand case+14.0+12.3 %

Waste collection service (CV10-W boxes, berths, carriages, transfer point)+2.6+2.2 %

Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay)+2.1+1.8 %

Emergency and monitoring package (rescue, cameras, sensors)+2.2+1.9 %

Towers and foundations ready for 4 tracks from day one+2.5+2.2 %

Second pair of tracks later, hung on ready towers+40.7+35.8 %

Second pair later without ready towers (second row of towers)+45.7+40.2 %

Own medium-voltage feeder on the towers+2.5+2.2 %

Backup generation for the peak hour (source open)+3.6+3.2 %

Couplers for coupled cabins+0.4+0.3 %

Switchable privacy glazing on the cabins near homes+0.4+0.4 %

Proposal 2 · Green link, canopy kept

## Mandai: Khatib and Springleaf MRT to the wildlife parks

No MRT station within walking distance of the parks: visitors ride shuttle and public buses from Khatib (NSL) or Springleaf (TEL), or drive and park. Four parks (Zoo, Night Safari, River Wonders, Bird Paradise) and a resort draw several million visits a year, peaking on weekends and holidays. Towers on small footprints along the existing road verges; no widening, no viaduct through the forest, the canopy kept. The line keeps to the existing road verges: no widening, no viaduct through the forest, towers clear of the wildlife crossings, quiet running at 40 km/h on Mandai Lake Road.

**8.5 km**7 stations in the base proposal (5 in the lowest-price version)

**US$ 105.8 M**base proposal, P50: US$ 12.5 M per km (9.9 without stations)

**9,683**passengers a day, base case (4,125 low, 17,189 high)

**Apr 2029**first service, median (Jul 2029 at the 90th percentile)

### The line on the ground

101 towers (11.9 a km, 10 m tall on average). Curves sit at stations or on short rail sections (7 along the line).

### Three versions, from the lowest price up

VersionStationsUS$ M, P10–P50–P90US$ M/km with / without stationsFirst-of-a-kind margin besidePassengers a dayBenefit / costProject return, base

Lowest-price proposal568.4–**77.6**–88.29.2 / 7.3+12.53,942–9,171–16,0890.57–1.57–3.386.0 %

Base proposal791.8–**105.8**–121.912.5 / 9.9+17.04,125–9,683–17,1890.50–1.40–3.063.9 %

Full version7114.2–**131.3**–151.415.5 / 11.8+21.14,125–9,683–17,1890.44–1.25–2.733.2 %

Lowest-price: fewer stations and the opening-year fleet. Base: every station, four-space small stations, own control centre, lightning protection on every tower and storm keepers on every cable support. Full: adds waste and parcel services, emergency and monitoring package, towers ready for four tracks, own medium-voltage feeder and backup generation.

### Door to door at the peak

TripCar (min)Bus or shuttle (min)Celestavia (min)Fare, S$ (resident)

Khatib MRT -> Zoo, Saturday 10:002943**15**2.87

Springleaf MRT -> Bird Paradise2842**15**2.65

Khatib MRT -> Springleaf MRT1525**10**2.04

### Capacity and service

At the peak the line runs cabins that leave when their passengers are aboard and run non-stop from station to station; average seat use 4.6 of 9, walk-in wait under 3 minutes for 95 % of passengers, a fleet of 88 cabins. Two tracks carry about 13,937 passengers an hour each way with cabins coupled in threes (the base case needs 779; the high case 1,361). Cabins keep a braking-distance gap to the cabin ahead.

### Fares, income and return

Fare S$ 1.50 plus S$ 0.20 a km (up to S$ 3.50). Average fare S$ 3.34. Base case income: fares US$ 9.2 M a year, private-cabin bookings US$ 0.9 M, other income net of its cost US$ 1.0 M (sponsorships (events, seasons, app), small cells / 5g on every 4th tower, in-cabin seatback screens, app / digital advertising). Operating cost US$ 9.0 M a year: all income covers it 1.2 times. In the base case a service payment of about US$ 6.3 M a year lifts the project return to 10 %. In the low case it would be about US$ 13.1 M a year.

Public benefit in the base case: 0.85 million hours saved a year, about 263 car round trips off the road each day, and 1.9 road injuries avoided a year. Energy: 0.12 kWh a passenger-km with the cabin air-conditioning, 2.1 GWh a year, peak 2.0 MW.

### Options, each priced on its own

Option (against the base proposal)US$ M, P50Share of the base

Two-space small stations instead of four-space (cheaper)-0.2-0.2 %

Fleet and stations for the high demand case+11.7+11.0 %

Waste collection service (CV10-W boxes, berths, carriages, transfer point)+2.5+2.4 %

Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay)+2.0+1.9 %

Emergency and monitoring package (rescue, cameras, sensors)+2.4+2.2 %

Towers and foundations ready for 4 tracks from day one+3.3+3.1 %

Second pair of tracks later, hung on ready towers+31.1+29.4 %

Second pair later without ready towers (second row of towers)+37.6+35.5 %

Own medium-voltage feeder on the towers+2.8+2.6 %

Backup generation for the peak hour (source open)+3.4+3.2 %

Couplers for coupled cabins+0.4+0.3 %

Switchable privacy glazing on the cabins near homes+0.4+0.4 %

Proposal 3 · Industrial estates and light cargo

## Tuas: dormitories, industrial estates and the port gate

The East-West Line ends at Tuas Link; the estates south of it reach 4-8 km from a station; many workers ride to work on the decks of lorries, which public safety debate has asked to end. Large worker dormitories and tens of thousands of jobs, concentrated at shift changes; light parts and parcels between firms and the new port. Light towers in the road verges of wide industrial roads; buses cost less to start but need drivers the country is short of. Port containers stay on the port’s own trucks; outside the shift peaks the line can carry light 10-ft boxes of parts, food and parcels (see Options).

**10.0 km**12 stations in the base proposal (6 in the lowest-price version)

**US$ 173.2 M**base proposal, P50: US$ 17.4 M per km (9.0 without stations)

**21,980**passengers a day, base case (9,540 low, 37,424 high)

**Apr 2029**first service, median (Jul 2029 at the 90th percentile)

### The line on the ground

119 towers (11.9 a km, 9 m tall on average). Curves sit at stations or on short rail sections (4 along the line).

### Three versions, from the lowest price up

VersionStationsUS$ M, P10–P50–P90US$ M/km with / without stationsFirst-of-a-kind margin besidePassengers a dayBenefit / costProject return, base

Lowest-price proposal698.7–**117.8**–143.311.8 / 6.7+18.96,617–15,774–27,7440.56–1.52–3.19-6.7 %

Base proposal12143.1–**173.2**–214.017.4 / 9.0+27.99,540–21,980–37,4240.62–1.69–3.50-3.4 %

Full version12182.2–**222.7**–278.722.3 / 11.0+35.89,540–21,980–37,4240.52–1.45–3.02-3.9 %

Lowest-price: fewer stations and the opening-year fleet. Base: every station, four-space small stations, own control centre, lightning protection on every tower and storm keepers on every cable support. Full: adds waste and parcel services, emergency and monitoring package, towers ready for four tracks, own medium-voltage feeder and backup generation.

### Door to door at the peak

TripCar (min)Bus or shuttle (min)Celestavia (min)Fare, S$ (resident)

Tuas View dormitories -> Tuas South Ave 1, 7:001426**10**1.33

Tuas Link MRT -> Tuas Port gate3251**18**2.20

Tuas South dormitories -> Tuas West Road2135**13**1.65

### Capacity and service

At the peak the line runs timetabled line cabins that call at the stations along the way; average seat use 7.5 of 9, walk-in wait under 1 minutes for 95 % of passengers, a fleet of 92 cabins. Two tracks carry about 12,721 passengers an hour each way with cabins coupled in threes (the base case needs 2,058; the high case 3,854). Cabins keep a braking-distance gap to the cabin ahead.

### Fares, income and return

Fare S$ 1.00 plus S$ 0.12 a km (up to S$ 2.20). Average fare S$ 1.46. Base case income: fares US$ 7.8 M a year, private-cabin bookings US$ 0.7 M, other income net of its cost US$ 1.2 M (sponsorships (events, seasons, app), in-cabin seatback screens, small cells / 5g on every 4th tower, app / digital advertising). Operating cost US$ 11.0 M a year: all income covers it 0.9 times. In the base case a service payment of about US$ 16.4 M a year lifts the project return to 10 %. In the low case it would be about US$ 21.5 M a year.

Public benefit in the base case: 2.04 million hours saved a year, about 179 car round trips off the road each day, and 7.6 road injuries avoided a year. Energy: 0.19 kWh a passenger-km with the cabin air-conditioning, 4.9 GWh a year, peak 2.6 MW.

### Options, each priced on its own

Option (against the base proposal)US$ M, P50Share of the base

Two-space small stations instead of four-space (cheaper)+0.0+0.0 %

Fleet and stations for the high demand case+36.2+20.9 %

Waste collection service (CV10-W boxes, berths, carriages, transfer point)+4.5+2.6 %

Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay)+2.3+1.3 %

Emergency and monitoring package (rescue, cameras, sensors)+2.5+1.5 %

Towers and foundations ready for 4 tracks from day one+3.5+2.0 %

Second pair of tracks later, hung on ready towers+85.0+49.1 %

Second pair later without ready towers (second row of towers)+91.8+53.0 %

Own medium-voltage feeder on the towers+3.0+1.8 %

Backup generation for the peak hour (source open)+4.4+2.5 %

Couplers for coupled cabins+0.4+0.2 %

Switchable privacy glazing on the cabins near homes+0.4+0.2 %

Proposal 4 · Campus and business parks on a hill

## Kent Ridge: NUS, the hospital, Science Park and one-north

Two Circle Line stations at the edges (Kent Ridge, one-north); inside, a fleet of internal shuttle buses carries most trips over 1-3 km. About 40,000 students and 12,000+ staff, the national university hospital and two business parks (Science Park, one-north) on one axis. Short line on campus land; the buses are cheap but crowded at class changes. The campus shuttle is free to students today, so the fare here is low and most passengers travel on a university pass: the university, or the State, buys the service.

**5.7 km**9 stations in the base proposal (5 in the lowest-price version)

**US$ 130.3 M**base proposal, P50: US$ 22.7 M per km (12.5 without stations)

**29,156**passengers a day, base case (12,887 low, 50,597 high)

**Apr 2029**first service, median (Jul 2029 at the 90th percentile)

### The line on the ground

78 towers (13.6 a km, 12 m tall on average). Curves sit at stations or on short rail sections (9 along the line).

### Three versions, from the lowest price up

VersionStationsUS$ M, P10–P50–P90US$ M/km with / without stationsFirst-of-a-kind margin besidePassengers a dayBenefit / costProject return, base

Lowest-price proposal575.5–**90.3**–109.915.7 / 8.8+14.510,467–23,484–40,8251.13–2.55–4.59–

Base proposal9107.7–**130.3**–159.822.7 / 12.5+20.912,887–29,156–50,5971.10–2.54–4.65–

Full version9129.4–**156.2**–191.427.2 / 15.2+25.112,887–29,156–50,5970.99–2.30–4.22–

Lowest-price: fewer stations and the opening-year fleet. Base: every station, four-space small stations, own control centre, lightning protection on every tower and storm keepers on every cable support. Full: adds waste and parcel services, emergency and monitoring package, towers ready for four tracks, own medium-voltage feeder and backup generation.

### Door to door at the peak

TripCar (min)Bus or shuttle (min)Celestavia (min)Fare, S$ (resident)

Kent Ridge MRT -> University Town, 8:452029**11**1.18

University Town -> Central Library1320**9**0.97

Buona Vista MRT -> Engineering2232**11**1.30

### Capacity and service

At the peak the line runs timetabled line cabins that call at the stations along the way; average seat use 7.4 of 9, walk-in wait under 1 minutes for 95 % of passengers, a fleet of 61 cabins. Two tracks carry about 13,423 passengers an hour each way with cabins coupled in threes (the base case needs 1,533; the high case 2,796). Cabins keep a braking-distance gap to the cabin ahead.

### Fares, income and return

Fare S$ 0.80 plus S$ 0.15 a km (up to S$ 1.50). Average fare S$ 0.48. Base case income: fares US$ 3.3 M a year, private-cabin bookings US$ 0.3 M, other income net of its cost US$ 1.3 M (sponsorships (events, seasons, app), in-cabin seatback screens, app / digital advertising, booking and marketplace fees in the app). Operating cost US$ 9.9 M a year: all income covers it 0.5 times. In the base case a service payment of about US$ 16.9 M a year lifts the project return to 10 %. In the low case it would be about US$ 18.8 M a year.

Public benefit in the base case: 2.85 million hours saved a year, about 91 car round trips off the road each day, and 0.6 road injuries avoided a year. Energy: 0.22 kWh a passenger-km with the cabin air-conditioning, 4.5 GWh a year, peak 1.4 MW.

### Options, each priced on its own

Option (against the base proposal)US$ M, P50Share of the base

Two-space small stations instead of four-space (cheaper)+0.0+0.0 %

Fleet and stations for the high demand case+14.9+11.4 %

Waste collection service (CV10-W boxes, berths, carriages, transfer point)+3.5+2.7 %

Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay)+2.1+1.6 %

Emergency and monitoring package (rescue, cameras, sensors)+2.1+1.6 %

Towers and foundations ready for 4 tracks from day one+2.9+2.2 %

Second pair of tracks later, hung on ready towers+59.8+45.9 %

Second pair later without ready towers (second row of towers)+65.4+50.2 %

Own medium-voltage feeder on the towers+2.3+1.8 %

Backup generation for the peak hour (source open)+2.3+1.8 %

Couplers for coupled cabins+0.2+0.2 %

Switchable privacy glazing on the cabins near homes+0.3+0.2 %

Comparison

## Celestavia beside other systems in Singapore

SystemkmUS$ M per kmPeak passengers an hour each waySource

Celestavia Southern Waterfront (base proposal)6.717.1 (12.0 without stations)12,917 two tracks, cabins coupled in threesCelestavia study, 24 Nov 2026

Celestavia Mandai (base proposal)8.512.5 (9.9 without stations)13,937 two tracks, cabins coupled in threesCelestavia study, 24 Nov 2026

Celestavia Tuas (base proposal)10.017.4 (9.0 without stations)12,721 two tracks, cabins coupled in threesCelestavia study, 24 Nov 2026

Celestavia Kent Ridge (base proposal)5.722.7 (12.5 without stations)13,423 two tracks, cabins coupled in threesCelestavia study, 24 Nov 2026

Thomson-East Coast Line (MRT, underground; over S$25 bn for 43 km as published)–453.9– MOT, Speech by Minister Khaw Boon Wan at TEL Stage 1 Open House (Jan 2020) (2020)

Johor Bahru – Singapore RTS Link (opening 2027)4.0–10,000 design capacityLTA, Johor Bahru-Singapore RTS Link project page (2026)

Sentosa Express monorail2.1–4,000 design capacity (secondary source)Wikipedia (last resort), Sentosa Express (2025)

An MRT line carries far more people an hour than a two-track Celestavia line and is the right choice for the island’s trunks. Celestavia’s case is a small fraction of the cost per km, towers on small footprints in the road verge instead of tunnels or viaducts, stations every few hundred metres, and lines that grow a cabin at a time. Costs from different years are shown as published (converted at S$ 1.28 per US$).

Tropical weather

## Squalls, lightning, heat and heavy rain

Singapore sees about 176 lightning days a year, among the highest rates in the world. Every tower carries lightning protection with surge protection for its battery and cabinets, and the carriage and cabin form a closed metal body. Outdoor boarding pauses under the national lightning alert. The strongest squall gusts on record would be able to lift an empty cable out of its open support, so every cable support has a storm keeper that is closed, with the line cleared, before a forecast squall, together with a fixed catcher and a sensor that proves each cable is seated before any carriage passes. Passenger service stops at the operating gust limit and cabins are brought to stations. Heat and humidity set the cabin air-conditioning load counted in the energy figures; foundations in reclaimed land and near the sea get corrosion protection.

Light cargo and a cross-border option

## Light 10-ft boxes in Tuas, and a western link to Johor

**Light boxes.** Outside the shift peaks the Tuas line has about 5,728 spare slots a day. Sending 400 light 10-ft boxes a day of parts, food and parcels between the estates and the port gate at about S$ 35 a box would bring about US$ 3.4 M a year (US$ 0.9–10.9 M across the cases). Port containers are not carried: they stay on the port’s own trucks.

**Johor (an option for two governments).** A link of about 9 km from Tuas Link over the Second Link to Gelang Patah would cost about US$ 159 M at the Tuas line’s cost per km, without the customs facilities, and carry about 12,721 passengers an hour each way with coupled cabins. It would need an agreement between Singapore and Malaysia; Celestavia shows it only as an option.

Power

## Electric, 1.5 kV DC, with the source left open

Each line takes 1.5 kV DC from substations along it, on two contact wires; the cables carry no current. Braking energy goes back to the line, or to an on-board braking resistor when the line cannot take it. The four base proposals together use about 13 GWh a year. The source is a choice: the grid, the line’s own medium-voltage feeder on the towers, or backup generation — each priced as an option. Every tower carries a battery for at least 21 days of sensors, cameras and communications without grid power.

Work and industry

## Jobs

Building the lines brings work to local contractors and suppliers of foundations, steel, cables and electrical works; operating them creates lasting skilled jobs in operation, maintenance, software and passenger service, with training. Cables, motors, cabins and their materials create work along the supply chain.

Schedule

## First passengers in under five years

Our goal is five years or less from approval to first service. Approvals set the pace; with the agencies running reviews and permits in parallel, design starting at once and the type approval from the test line, each line opens in under three years.

ProposalFirst service, medianFirst service, 90th percentileWhole line, median

Southern WaterfrontApr 2029Jul 2029Apr 2029

MandaiApr 2029Jul 2029Apr 2029

TuasApr 2029Jul 2029Apr 2029

Kent RidgeApr 2029Jul 2029Apr 2029

Months counted from January 2027.

Options for government and investors

## The choices are yours

- **Which proposal first**: the Southern Waterfront (highest return), Mandai (green access to the parks), Tuas (workers and light cargo) or Kent Ridge (campus) — or a demonstration line in one of them.

- **Which version**: lowest-price, base or full, and each option above on its own.

- **Financing**: a concession with State land and road corridors in kind, an availability payment where a line serves public goals beyond its fares, a service contract with the university, the reserve or the employers, or a public–private partnership. If the State takes several lines, one shared control centre saves about US$ 47 M.

- **Cross-border**: the western link to Johor, if both governments want it.

Celestavia designs the system, its electronics and software, and brings the partners together; towers, cabins, carriages and buildings are made and built by contracted suppliers.

[What Celestavia needs from a government](https://celestavia.com/en/government/) · [Contact us](https://celestavia.com/en/contact/)

Method and sources

- Method: for each line, today’s door-to-door trips by car, taxi, bus, shuttle, monorail and on foot are compared with the trip by Celestavia; capacity, fleet and stations follow from the peak hour; cost ranges come from thousands of draws of every unit price; the return and the benefit/cost use one method for every country. Alignments are drawn between existing places along road corridors and are not surveyed.

- Land Transport Authority (rail network, ridership, fares, the RTS Link, Land Transport Master Plan 2040); Department of Statistics (population, 2025); Traffic Police (road casualties, 2025); Ministry of Manpower (wages, 2025); Energy Market Authority (grid emission factor); SP Group (tariffs, Q4 2026); Meteorological Service Singapore and NEA (lightning, rainfall, wind); Building and Construction Authority (prices and demand, 2026); Singapore Tourism Board, Changi Airport Group, Sentosa Development Corporation, Mandai Wildlife Group, NUS, URA (Greater Southern Waterfront); Ministry of Transport speeches (rail costs). Station positions: Wikipedia and OpenStreetMap. Terrain: Copernicus GLO-30 (European Space Agency).

- Data to request later: travel survey extracts for the four corridors, bus boardings by stop, arrival surveys at Mandai and Sentosa, campus shuttle counts, dormitory and shift data in Tuas, local unit prices and supplier quotes.

Projections, not guarantees: every project figure on this page is simulated for this concept study (24 November 2026); costs are ranges until suppliers quote.

© Global Genius Trust y Celestavia Co.

Join us

## Join Celestavia

**Public authorities, transport operators, business people and the general public** are invited to learn about the proposal, share their ideas and join in. Sign up and we will keep you posted on the project.

---

## Where to go next

- Agent guide: [https://celestavia.com/llms.txt](https://celestavia.com/llms.txt)
- English pages: [https://celestavia.com/en/llms.txt](https://celestavia.com/en/llms.txt)
- Spanish country and corridor pages: [https://celestavia.com/es-la/llms.txt](https://celestavia.com/es-la/llms.txt)
- Complete URL inventory: [https://celestavia.com/wp-sitemap.xml](https://celestavia.com/wp-sitemap.xml)
- Contact: [https://celestavia.com/en/contact/](https://celestavia.com/en/contact/)

Project pages publish proposed fares and cost ranges; no share price is published. Corridor pages
are proposals at varying stages, not committed construction.
