---
title: "Celestavia: China – Celestavia Personal & Cargo Rapid Transit"
description: "Celestavia in China: where the elevated electric cable system fits (mountain and river cities, scenic areas, mid-size cities without metro) and three proposals for government and investors: Zhangji..."
canonical: "https://celestavia.com/en/china/"
language: "en"
last-updated: "2026-11-23"
site: "Celestavia - Personal & Cargo Rapid Transit"
status-note: "Corridor pages describe proposals and route studies, not scheduled construction."
---

# Celestavia: China

[About](https://celestavia.com/en/#what)
[Investors](https://celestavia.com/en/investors/)
[Government](https://celestavia.com/en/government/)
[Heavy Cargo](https://celestavia.com/en/heavycargo/)
[Contact](https://celestavia.com/en/contact/)
Español

Celestavia · China · Proposals for government and investors

# Where Celestavia fits in China, and three proposals

Electric carriages run on large, fixed high-strength steel cables carried by towers above the streets, rivers and hills; a nine-seat passenger cabin or a light 10-ft cargo box hangs below each carriage. 1.5 kV DC, with braking energy returned to the line.

China has the world’s largest high-speed rail and metro networks. Celestavia does not compete with them: it reaches the places they find hard — steep and river-cut cities, scenic areas that need a light footprint, and mid-size cities below the national thresholds for a metro.

**3 proposals**Zhangjiajie, Zunyi, Chongqing: 63 km in all

**US$ 459 M**the three base proposals together (P50, 2026 US$)

**218 thousand**passengers a day in the base case

**Apr 2029**first service (median), under 5 years

ProposalLineBase proposal, US$ M (P10–P50–P90)US$ M per km, with / without stationsPassengers a day (low–base–high)Benefit / cost (low–base–high)

Zhangjiajie35.0 km150.8–**166.1**–183.44.7 / 4.011,426–30,535–54,4990.57–2.02–4.71

Zunyi20.4 km189.1–**221.9**–265.010.9 / 4.967,685–162,674–279,9001.28–3.52–7.56

Chongqing7.5 km62.4–**70.6**–80.39.5 / 7.09,474–24,496–48,0350.44–1.64–4.23

Benefit/cost at China’s 8 % social discount rate. A first-of-a-kind margin is shown beside each total, not inside it. Each proposal also comes as a lowest-price version and a full version, and every extra is priced on its own.

**Project film: to follow**A film for this page will be made after the proposals are reviewed.

A fair reading

## What China already has, and where Celestavia adds value

**50,400 km**high-speed rail in operation (end of 2025)

**13,068 km**urban rail in 58 cities (2025)

**33.4 billion**urban rail trips a year (2025)

**1,500,000**urban residents a city needs for light rail approval; 3,000,000 for a metro (2018 rules)

Where it does not add value

- **Intercity travel**: China's high-speed rail network is the world's largest; a light line at 70-90 km/h does not compete on intercity trips.

- **The busiest city corridors**: a metro line carries tens of thousands of passengers an hour each way; a two-track Celestavia line carries a few thousand with single cabins and about ten thousand with cabins coupled in threes.

- **Bulk freight**: rail, barges and belt conveyors move ore, coal and containers at a fraction of a heavy cable line's cost per tonne at China's volumes.

- **Flat cities with wide roads**: a bus rapid transit line or a tram does the job for less.

- **Open-water crossings**: sea links such as the bridge to the Yangshan port need towers in the water.

Where it does

- **Mountain and river cities**: hillside districts above deep metro stations, ridges and river crossings.

- **Scenic areas**: a light footprint from the rail station to the park gate; the view is part of the trip.

- **Mid-size cities without metro**: a metro-like network for cities below the 2018 approval thresholds.

- **Last-mile feeders**: short links from metro and high-speed rail stations up the slopes.

- **Fast, low-disruption builds**: towers on small footprints, prefabricated parts, few road closures.

Roads: 59,280 deaths and 254,112 injuries were reported to the police in 2024; the World Health Organization estimates 248,099 road deaths for 2021. On the railways, the national railway administration publishes the yearly change in accident deaths (2024: down 18 %) rather than the count. Taking cars off steep, congested roads is part of each proposal’s public benefit; zero accidents is the goal of the system’s design.

Screening

## Twenty places screened, three chosen for a full study

Each place was scored on terrain, the gap in today’s public transport, the size of the flows, Celestavia’s cost and build-speed edge, fit with national rules, and — as a penalty — how good the existing alternative already is. The ranking holds when the weights are changed; the three leaders stay in the top five in every case tried.

RankPlaceKindScoreWhat Celestavia adds

1Zhangjiajie: high-speed rail and city to WulingyuanTourism areas with heavy visitor flows87A scenic 30-minute ride from the high-speed rail station to the park gate, above the traffic, with the view as part of the trip.

2Zunyi: hilly mid-size city without metroMid-size cities without metro84A metro-like network at a fraction of metro cost, built above the streets.

3Chongqing: river-and-mountain line (Yuzhong – Yangtze – Nanshan)Mountain and river cities80Riverside to ridge in minutes, a river crossing without a bridge, sightseeing capacity many times the old cableway's, a feeder to the metro.

4Panzhihua: steep valley city with minesMid-size cities without metro69Slope-to-valley links; light cargo.

5Shiyan: long narrow valley cityMid-size cities without metro68A valley trunk plus Wudang Mountain visitors.

6Guiyang: karst hills, metro feedersMountain and river cities64Hill-to-station feeders.

7Huangshan: high-speed rail to the scenic areaTourism areas with heavy visitor flows63Station-to-gate link.

8Lijiang: old town to Jade Dragon Snow MountainTourism areas with heavy visitor flows63Town-to-mountain scenic link.

9Jiuzhaigou: new rail station to the parkTourism areas with heavy visitor flows59Station-to-gate link.

10Lanzhou: linear valley city, hillside estatesMountain and river cities56Valley-floor metro to slope estates and river crossings.

11Guilin: karst tourist city without metroMid-size cities without metro55A low-footprint line among the karst.

12Mountain farm and parcel logistics (Wuling and Wumeng mountains)Ports, mines and heavy-cargo corridors47Light boxes and passengers over gorges where roads wind for hours.

Score out of 100. Big-city metro trunks, bulk freight and the large container ports rank last: existing systems do those jobs well.

Proposal 1 · Tourism

## Zhangjiajie: the city and high-speed rail to Wulingyuan

Sandstone and karst hills between the city and the park; the road winds 36 km. No rail or transit plan for the corridor; buses 40-60 min. 41.6 million tourist visits (2025); more than 60,000 a day at the Forest Park on peak days.

**35.0 km**8 stations in the base proposal (4 in the lowest-price version)

**US$ 166.1 M**base proposal, P50: US$ 4.7 M per km (4.0 without stations)

**30,535**passengers a day, base case (11,426 low, 54,499 high)

**Apr 2029**first service, median (Jul 2029 at the 90th percentile)

### The line on the ground

413 towers (11.8 a km, 15 m tall on average); the ground rises from 154 to 766 m and the steepest kilometre of cable climbs 13 %. Curves sit at stations or on short rail sections (95 along the line).

### Three versions, from the lowest price up

VersionStationsUS$ M, P10–P50–P90US$ M/km with / without stationsFirst-of-a-kind margin besidePassengers a dayBenefit / costProject return, base

Lowest-price proposal4118.7–**131.2**–145.33.7 / 3.4+21.19,617–26,040–46,3080.65–2.31–5.3516.9 %

Base proposal8150.8–**166.1**–183.44.7 / 4.0+26.711,426–30,535–54,4990.57–2.02–4.7114.7 %

Full version8180.0–**198.8**–220.25.7 / 4.8+32.011,426–30,535–54,4990.51–1.82–4.2813.0 %

Lowest-price: fewer, two-space stations and the opening-year fleet. Base: every station of the density rule, four-space small stations, megastation(s), own control centre. Full: adds waste and parcel services, emergency and monitoring package, towers ready for four tracks, own medium-voltage feeder and backup generation.

### Door to door at the peak

TripCar (min)Bus or coach (min)Celestavia (min)Fare, CNY (resident)

West station -> Wulingyuan5070**34**15.1

City centre -> Wulingyuan78108**44**18.8

City centre -> West station3650**19**6.6

### Capacity and service

At the peak the line runs cabins that leave when their passengers are aboard and run non-stop from station to station; average seat use 6.8 of 9, walk-in wait under 3 minutes for 95 % of passengers, a fleet of 470 cabins. Two tracks carry about 12,348 passengers an hour each way with cabins coupled in threes (the base case needs 1,810; the high case 3,478). Cabins keep a braking-distance gap to the cabin ahead.

### Fares, income and return

Resident fare CNY 3 plus CNY 0.45 a km (up to CNY 30); the legal reduced-fare groups pay the bus fare. Average fare CNY 19.8. Base case income: fares US$ 29.8 M a year, private-cabin bookings US$ 2.8 M, other income net of its cost US$ 2.2 M (small cells / 5g on every 4th tower, sponsorships (events, seasons, app), park-and-ride and ev charging at the megas, in-cabin seatback screens). Operating cost US$ 14.2 M a year: all income covers it 2.5 times. Fares and other income cover the operating cost and repay the capital in the base case without a public payment. In the low case it would be about US$ 12.3 M a year.

Public benefit in the base case: 4.8 million hours saved a year, about 863 car round trips off the road each day, and 1.4 road deaths and 6 injuries avoided a year. Energy: 0.10 kWh a passenger-km, 22.2 GWh a year, peak 13.9 MW.

### Options, each priced on its own

Option (against the base proposal)US$ M, P50Share of the base

Two-space small stations instead of four-space (cheaper)-0.1-0.1 %

Fleet and stations for the high demand case+30.3+18.2 %

Waste collection service (CV10-W boxes, berths, carriages, transfer point)+1.5+0.9 %

Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay)+1.1+0.7 %

Emergency and monitoring package (rescue, cameras, sensors)+2.6+1.6 %

Towers and foundations ready for 4 tracks from day one+2.8+1.7 %

Second pair of tracks later, hung on ready towers+45.0+27.1 %

Second pair later without ready towers (second row of towers)+50.5+30.4 %

Own medium-voltage feeder on the towers+4.0+2.4 %

Backup generation for the peak hour (source open)+14.2+8.6 %

Couplers for coupled cabins+1.5+0.9 %

Proposal 2 · Mid-size city without metro

## Zunyi: Huichuan, the old town and the new district

Karst hills; the city sits on ridges and valleys at 800-1,000 m. No urban rail; buses only. A central city of a few million residents; trips concentrated on a few axes.

**20.4 km**26 stations in the base proposal (15 in the lowest-price version)

**US$ 221.9 M**base proposal, P50: US$ 10.9 M per km (4.9 without stations)

**162,674**passengers a day, base case (67,685 low, 279,900 high)

**Apr 2029**first service, median (Jul 2029 at the 90th percentile)

### The line on the ground

241 towers (11.8 a km, 12 m tall on average); the ground rises from 816 to 984 m and the steepest kilometre of cable climbs 11 %. Curves sit at stations or on short rail sections (60 along the line).

### Three versions, from the lowest price up

VersionStationsUS$ M, P10–P50–P90US$ M/km with / without stationsFirst-of-a-kind margin besidePassengers a dayBenefit / costProject return, base

Lowest-price proposal15128.9–**149.9**–177.77.4 / 3.8+24.153,898–131,678–232,2131.46–3.83–7.9711.0 %

Base proposal26189.1–**221.9**–265.010.9 / 4.9+35.767,685–162,674–279,9001.28–3.52–7.569.6 %

Full version26280.0–**337.1**–413.416.5 / 6.1+54.267,685–162,674–279,9000.94–2.64–5.786.4 %

Lowest-price: fewer, two-space stations and the opening-year fleet. Base: every station of the density rule, four-space small stations, megastation(s), own control centre. Full: adds waste and parcel services, emergency and monitoring package, towers ready for four tracks, own medium-voltage feeder and backup generation.

### Door to door at the peak

TripCar (min)Bus or coach (min)Celestavia (min)Fare, CNY (resident)

Huichuan north -> old town4360**18**4.4

Old town -> new district4158**20**5.7

Huichuan north -> new district76105**30**7.6

### Capacity and service

At the peak the line runs timetabled line cabins that call at the stations along the way, coupled in threes at the busiest times; average seat use 7.5 of 9, walk-in wait under 1 minutes for 95 % of passengers, a fleet of 417 cabins. Two tracks carry about 11,134 passengers an hour each way with cabins coupled in threes (the base case needs 5,516; the high case 10,110). Cabins keep a braking-distance gap to the cabin ahead.

### Fares, income and return

Resident fare CNY 2.5 plus CNY 0.25 a km (up to CNY 8); the legal reduced-fare groups pay the bus fare. Average fare CNY 3.3. Base case income: fares US$ 23.6 M a year, private-cabin bookings US$ 2.2 M, other income net of its cost US$ 3.7 M (in-cabin seatback screens, app / digital advertising, booking and marketplace fees in the app, sponsorships (events, seasons, app)). Operating cost US$ 14.1 M a year: all income covers it 2.1 times. In the base case an availability payment of about US$ 1.0 M a year lifts the project return to 10 %. In the low case it would be about US$ 18.1 M a year.

Public benefit in the base case: 20.3 million hours saved a year, about 8,369 car round trips off the road each day, and 4.9 road deaths and 21 injuries avoided a year. Energy: 0.09 kWh a passenger-km, 20.3 GWh a year, peak 12.2 MW.

### Options, each priced on its own

Option (against the base proposal)US$ M, P50Share of the base

Two-space small stations instead of four-space (cheaper)+0.0+0.0 %

Fleet and stations for the high demand case+111.6+50.3 %

Waste collection service (CV10-W boxes, berths, carriages, transfer point)+3.7+1.7 %

Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay)+2.0+0.9 %

Emergency and monitoring package (rescue, cameras, sensors)+1.9+0.9 %

Towers and foundations ready for 4 tracks from day one+1.4+0.6 %

Second pair of tracks later, hung on ready towers+126.4+57.0 %

Second pair later without ready towers (second row of towers)+129.2+58.2 %

Own medium-voltage feeder on the towers+3.0+1.3 %

Backup generation for the peak hour (source open)+12.5+5.7 %

Couplers for coupled cabins+0.0+0.0 %

Proposal 3 · Mountain and river city

## Chongqing: Yuzhong, across the Yangtze, up to Nanshan

Two rivers and a 400-680 m ridge beside the centre; the riverside escarpment rises about 230 m in a kilometre. Over 600 km of urban rail, but no station serves the Nanshan ridge; the 1987 Yangtze cableway (one 66-place cabin each way) has queues. 470 million domestic tourist visits (2024) and the cableway's 4 million passengers a year show the flow; hillside residents add daily trips.

**7.5 km**7 stations in the base proposal (5 in the lowest-price version)

**US$ 70.6 M**base proposal, P50: US$ 9.5 M per km (7.0 without stations)

**24,496**passengers a day, base case (9,474 low, 48,035 high)

**Apr 2029**first service, median (Jul 2029 at the 90th percentile)

### The line on the ground

87 towers (11.7 a km, 18 m tall on average); the ground rises from 168 to 537 m and the steepest kilometre of cable climbs 12 %. Curves sit at stations or on short rail sections (21 along the line). It crosses the Yangtze River bank to bank in one long span.

### Three versions, from the lowest price up

VersionStationsUS$ M, P10–P50–P90US$ M/km with / without stationsFirst-of-a-kind margin besidePassengers a dayBenefit / costProject return, base

Lowest-price proposal539.6–**44.6**–50.66.0 / 4.9+7.27,700–19,276–37,9070.44–1.64–4.1929.6 %

Base proposal762.4–**70.6**–80.39.5 / 7.0+11.49,474–24,496–48,0350.44–1.64–4.2323.2 %

Full version779.1–**89.6**–102.212.0 / 8.5+14.49,474–24,496–48,0350.38–1.44–3.7519.9 %

Lowest-price: fewer, two-space stations and the opening-year fleet. Base: every station of the density rule, four-space small stations, megastation(s), own control centre. Full: adds waste and parcel services, emergency and monitoring package, towers ready for four tracks, own medium-voltage feeder and backup generation.

### Door to door at the peak

TripCar (min)Bus or coach (min)Celestavia (min)Fare, CNY (resident)

Jiefangbei -> Nanshan viewpoints4563**15**5.5

Jiefangbei -> Huangjueya5070**16**6.0

Shangxinjie metro -> Huangjueya3447**14**5.0

Xiaoshizi -> Botanical Garden5273**17**6.4

### Capacity and service

At the peak the line runs cabins that leave when their passengers are aboard and run non-stop from station to station; average seat use 6.0 of 9, walk-in wait under 3 minutes for 95 % of passengers, a fleet of 135 cabins. Two tracks carry about 13,812 passengers an hour each way with cabins coupled in threes (the base case needs 1,995; the high case 4,192). Cabins keep a braking-distance gap to the cabin ahead. About 7,726 visitors a day ride the river-and-ridge loop for the view (CNY 30 return).

### Fares, income and return

Resident fare CNY 3 plus CNY 0.5 a km (up to CNY 10); the legal reduced-fare groups pay the bus fare. Average fare CNY 15.2. Base case income: fares US$ 18.8 M a year, private-cabin bookings US$ 0.7 M, other income net of its cost US$ 5.0 M (packages and passes (ski / park / attraction bundles), sightseeing / attraction tickets and events, sponsorships (events, seasons, app), in-cabin seatback screens). Operating cost US$ 7.5 M a year: all income covers it 3.3 times. Fares and other income cover the operating cost and repay the capital in the base case without a public payment. In the low case it would be about US$ 1.0 M a year.

Public benefit in the base case: 2.8 million hours saved a year, about 567 car round trips off the road each day, and 0.3 road deaths and 1 injuries avoided a year. Energy: 0.12 kWh a passenger-km, 5.2 GWh a year, peak 4.4 MW.

### Options, each priced on its own

Option (against the base proposal)US$ M, P50Share of the base

Two-space small stations instead of four-space (cheaper)-0.0-0.1 %

Fleet and stations for the high demand case+14.2+20.1 %

Waste collection service (CV10-W boxes, berths, carriages, transfer point)+1.5+2.1 %

Parcels and light cargo (lockers, CV10-L boxes, carriages, sorting bay)+1.0+1.5 %

Emergency and monitoring package (rescue, cameras, sensors)+1.2+1.7 %

Towers and foundations ready for 4 tracks from day one+0.8+1.1 %

Second pair of tracks later, hung on ready towers+20.3+28.8 %

Second pair later without ready towers (second row of towers)+21.8+30.9 %

Own medium-voltage feeder on the towers+2.1+2.9 %

Backup generation for the peak hour (source open)+4.5+6.3 %

Couplers for coupled cabins+0.4+0.6 %

Comparison

## Celestavia beside other systems built in China

SystemkmUS$ M per kmPeak passengers an hour each waySource

Celestavia Zhangjiajie (base proposal)35.04.7 (4.0 without stations)12,348 two tracks, cabins coupled in threesCelestavia study, 22 Nov 2026

Celestavia Zunyi (base proposal)20.410.9 (4.9 without stations)11,134 two tracks, cabins coupled in threesCelestavia study, 22 Nov 2026

Celestavia Chongqing river-and-mountain line (base proposal)7.59.5 (7.0 without stations)13,812 two tracks, cabins coupled in threesCelestavia study, 22 Nov 2026

Urban rail under construction in China, average–119.930,000 metro approval threshold (long-term peak flow)CAMET, Urban Rail Transit 2025 Annual Statistics and Analysis Report (2025)

Modern tram, average of 34 Chinese lines–21.6– China News Service (中新网), report on Chinese tram lines (2 Feb 2024) (2023)

Automated rubber-tyred line, Chongqing Bishan (2021)15.417.410,000 upper bound of the product classJiemian (界面新闻), 2021 (2021)

Straddle monorail, Chongqing Line 367.0–32,000 capacity; cost scope unclear in the sourcerailway-technology.com / Railway Gazette (search-result summary) (2019)

Suspended monorail, Wuhan Optics Valley (2023)10.5–– 220 passengers a train; cost not publishedWikipedia 'Optics Valley Suspended Monorail'; Jiemian 2023 (2023)

Bus rapid transit, Guangzhou (infrastructure only)22.54.5– about 800,000 boardings a dayITDP, Guangzhou BRT article (Mar 2010); development.asia case study (2010)

Aerial cableway, Chongqing Yangtze River (1987)1.2–– two cabins of 65 passengers; over 4 million passengers a yearChina News Service (6 Feb 2018) (2017)

Aerial cableway, Tianmen Mountain, Zhangjiajie (2005)7.5–1,000 about 1,000 an hour (travel sources; uncertain)Wikipedia 'Tianmen Mountain' (2005)

Mountain tourist railway, Dujiangyan – Siguniang (building)123.224.2– cost a lower bound ('over CNY 20 bn')Sichuan Online / 川观新闻 (27 Sep 2020) (2020)

A metro or a straddle monorail carries far more people an hour than a two-track Celestavia line, and is the right choice for a city’s busiest trunk. Celestavia’s case is a lower cost per km on steep or river-cut ground, towers on small footprints instead of tunnels or viaducts, stations every few hundred metres, direct cabins, and lines that grow a cabin at a time. Costs from different years are shown as published (converted at CNY 6.71 per US$).

Heavy cargo

## Why heavy cargo lines are not proposed in China

China moves ore, coal and containers by rail, barge, belt conveyor and truck at very low rates. A two-lane Celestavia heavy line at about US$ 17 M a km would cost, for its capital alone, about CNY 1.98 a tonne-km at 5 million tonnes a year — 5 times the road freight rate of about CNY 0.40 — and would match road freight only above roughly 25 million tonnes a year. Heavy lines fit China only as short links from a mine to a railhead where no road can be built. Light 10-ft boxes for parcels and farm produce on the passenger lines are offered as an option on each proposal.

Power

## Electric, 1.5 kV DC, with the source left open

Each line takes 1.5 kV DC from substations along it, on two contact wires; the cables carry no current. Braking energy goes back to the line, or to an on-board braking resistor when the line cannot take it. The three base proposals together use about 48 GWh a year. The source is a choice: the city grid, the line’s own medium-voltage feeder on the towers, or backup generation — each priced as an option. Every tower carries a battery for at least 21 days of sensors, cameras and communications without grid power.

Operating in all weather

## Heat, fog, storms, freezing rain and earthquakes

Operation steps down in levels — full, partial, secured, rescue — as wind, ice or seismic sensors on every tower report. Summer heat in Chongqing sets the cabin air-conditioning load counted in the energy figures; winter freezing rain on the Guizhou plateau (Zunyi) sets the icy-cable case for the steepest grades; passenger service stops at the operating gust limit and cabins are brought to stations. Towers are sized for the local seismic code. Fibre, 5G and cameras along the line report every tower and cabin to the control centre.

Work and industry

## Jobs

Building the lines brings work to local crews and suppliers of foundations, steel, cables and electrical works; operating them creates lasting skilled jobs in operation, maintenance and passenger service, with training. Cables, motors, cabins and their materials draw on China’s manufacturing industry.

Schedule

## First passengers in under five years

Our goal is five years or less from approval to first service. Approvals set the pace; where the government runs studies, permits and land in parallel, design starts at once and the type approval comes from the test line, each line opens in about two and a half years.

ProposalFirst service, medianFirst service, 90th percentileWhole line, median

ZhangjiajieApr 2029Jul 2029Apr 2029

ZunyiApr 2029Jul 2029Apr 2029

ChongqingApr 2029Jul 2029Apr 2029

Months counted from January 2027.

Options for government and investors

## The choices are yours

- **Which proposal first**: tourism (Zhangjiajie), a mid-size city without metro (Zunyi), or a mountain and river city (Chongqing) — or a demonstration line in one of them.

- **Which version**: lowest-price, base or full, and each option above on its own.

- **Financing**: a concession with the public side’s land and right of way in kind, development banks, an availability payment where a line serves public goals beyond its fares, or a public–private partnership. The local Celestavia company operates the lines.

- **Other places**: Guiyang, Lanzhou, Shiyan, Panzhihua, Huangshan and Lijiang ranked next; the same study can be run for any city.

Celestavia designs the system, its electronics and software, and brings the partners together; towers, cabins, carriages and buildings are made and built by contracted suppliers, many of them in China.

[What Celestavia needs from a government](https://celestavia.com/en/government/) · [Contact us](https://celestavia.com/en/contact/)

Method and sources

- Method: for each line, today’s door-to-door trips by car, taxi, bus, coach, metro, motorcycle and on foot are compared with the trip by Celestavia; capacity, fleet and stations follow from the peak hour; cost ranges come from thousands of draws of every unit price; the return and the benefit/cost use one method for every country. Alignments are drawn on the terrain model between existing places and are not surveyed.

- National Bureau of Statistics (Statistical Communiqué 2025; China Statistical Yearbook 2025); China State Railway Group and National Railway Administration (2025); China Association of Metros, annual report 2025; State Council General Office document No. 52 (2018); Ministry of Public Security (2025); Ministry of Culture and Tourism (2025); World Health Organization, Global status report on road safety 2023; Ministry of Ecology and Environment (grid emission factor, 2023); China Foreign Exchange Trade System (19 Nov 2026).

- Chongqing Municipal Bureau of Statistics (2025); Chongqing tourism figures (2024); China News Service and The Paper (Yangtze River cableway); Zhangjiajie statistics as reported by Hunan Daily (2025); CAAC airport statistics (2025); Wikipedia and Wikidata for station positions; Zunyi 2020 census; Amap traffic report (2024).

- Costs of other systems: CAMET (2025), China News Service (trams, 2023), Jiemian (Bishan line, 2021), ITDP (Guangzhou BRT, 2010), Sichuan Online (Dujiangyan – Siguniang railway, 2020). Terrain: Copernicus GLO-30 (European Space Agency).

- Data to request later: city travel surveys, bus passenger counts by line, visitor counts by gate, local unit prices and supplier quotes.

Projections, not guarantees: every project figure on this page is simulated for this concept study (22 November 2026); costs are ranges until suppliers quote.

© Global Genius Trust y Celestavia Co.

Join us

## Join Celestavia

**Public authorities, transport operators, business people and the general public** are invited to learn about the proposal, share their ideas and join in. Sign up and we will keep you posted on the project.

---

## Where to go next

- Agent guide: [https://celestavia.com/llms.txt](https://celestavia.com/llms.txt)
- English pages: [https://celestavia.com/en/llms.txt](https://celestavia.com/en/llms.txt)
- Spanish country and corridor pages: [https://celestavia.com/es-la/llms.txt](https://celestavia.com/es-la/llms.txt)
- Complete URL inventory: [https://celestavia.com/wp-sitemap.xml](https://celestavia.com/wp-sitemap.xml)
- Contact: [https://celestavia.com/en/contact/](https://celestavia.com/en/contact/)

Project pages publish proposed fares and cost ranges; no share price is published. Corridor pages
are proposals at varying stages, not committed construction.
